DUO™ - Drill Pipe Field Thread Repair

Поділитися
Вставка
  • Опубліковано 20 жов 2024
  • After 354,000FT(108,000m) Drilled, 585 Joints of Range 3 480 DUO Drill Pipe were inspected:
    4% - 21 x Pins and 26 x Boxes were Field Refaced
    0.7% - 7 x Ends were Field Repaired(As Video Shown)
    0.4% - 5 x Ends sent for Machine Shop Repaired

КОМЕНТАРІ • 2