Bleed Duct Rupture Particular Risk Analysis - Fabio Stabile - Aircraft Certification

Поділитися
Вставка
  • Опубліковано 9 лис 2024

КОМЕНТАРІ • 2

  • @chitoomizuide3135
    @chitoomizuide3135 3 роки тому +2

    Thank you Rafaela-san, Clarissa-san, and Fabio-san for this interesting channel.
    Fabao, you are great!!
    It was one of the tough topic for certification.
    I think it's also good to include explanation how to consider the size of leakage and how to describe the analysis for authority.
    Besides certification but related that how to detect bleed leakage is also interesting subject.
    Regarding electrical airplane, it's necessarily to consider the weight because more generators are needed to take energy from instead of bleed. At current technology, generating power density vs weight, it could be paid by light structure such as composite. But only large aircraft would be paid. I think.
    When the new technology will be developed and trying to install into aircraft, there would be a big and important discusses with authorities for certification like Lithium Ion Battery.
    Thank you.

    • @AircraftCertification
      @AircraftCertification  2 роки тому

      Thank you Mizuide-san! You always bring great contributions!!!! Good point about the more electrical aircraft. I would love to hear the opinion of our subscribers about that!