I think it was me who had a stab at Quantifying the concrete in the arch last time... I talked in barrows last time, now I reckon just shy of a quarter cube, perhaps 0.23m3? Excellent progress brother! Keep up the good work!
@ZylonFPV basically just ground floor finished no stairs . But I will try do in the loft as much as possible so that when or if we put stairs in its up to code and will pass easy just down to money mate. If I could I would do all straight away but might not be able too
@@ZylonFPV @ZylonFPV for sure and the old saying more room more mess lol be good for storage definitely want to floor it so if I do that I might as well just insulate and skim the ceilings that way I'm not insulating it twice if that makes sense? But to do it all to code so as again when come to that stage I'm good to just finish but will have to have electric and heating pipes all sitting ready also
Looks like a bloody castle!
Thanks man :)
Looks like a castle mate lol 👍👍👍
Haha if only I could have done outside in stone
I think it was me who had a stab at Quantifying the concrete in the arch last time...
I talked in barrows last time, now I reckon just shy of a quarter cube, perhaps 0.23m3?
Excellent progress brother! Keep up the good work!
Yea i was just remembering it off the mixes amounts haha but you are the closest one for sure :)
Good progress! Is it going to be one floor or two?
Plans has it to be left ready for future conversion so plan is to get as much of that done in advance
@@macplastering future conversion to 2 floors but initially one? Not sure what you mean 🙂
@ZylonFPV basically just ground floor finished no stairs . But I will try do in the loft as much as possible so that when or if we put stairs in its up to code and will pass easy just down to money mate. If I could I would do all straight away but might not be able too
@@macplastering I see, good thinking! Even just ground floor looks quite big though so I’m sure it will do you fine!
@@ZylonFPV @ZylonFPV for sure and the old saying more room more mess lol be good for storage definitely want to floor it so if I do that I might as well just insulate and skim the ceilings that way I'm not insulating it twice if that makes sense? But to do it all to code so as again when come to that stage I'm good to just finish but will have to have electric and heating pipes all sitting ready also