Halliburton's New iCruise™ Intelligent Rotary Steerable System

Поділитися
Вставка
  • Опубліковано 21 сер 2024
  • In this video, we get a hands-on review of Halliburton's New iCruise™ Intelligent Rotary Steerable System! You'll learn more about the basics of directional drilling, as well as what makes Halliburton's new directional BHA so exciting. This new tool is quite different than their previous directional tools, as well as their competitors. With incredible technological abilities and the reliability of push-the-bit directional drilling, this is a must see!
    If you'd like to learn more about the drilling process, directional steering, wellbore design, etc., then check out our online courses at www.OilfieldBasics.com/learn.

КОМЕНТАРІ • 78

  • @neilreid9005
    @neilreid9005 3 роки тому +10

    Thank you! Finally an understandable and clear description of how to bend an oil string. Well done.

    • @hunterjameson6236
      @hunterjameson6236 3 роки тому

      you probably dont care at all but does anyone know a method to get back into an instagram account??
      I was dumb forgot the account password. I appreciate any tips you can offer me!

    • @merrickchristian9392
      @merrickchristian9392 3 роки тому

      @Hunter Jameson instablaster ;)

    • @hunterjameson6236
      @hunterjameson6236 3 роки тому

      @Merrick Christian Thanks so much for your reply. I found the site through google and Im trying it out atm.
      I see it takes quite some time so I will get back to you later with my results.

    • @hunterjameson6236
      @hunterjameson6236 3 роки тому

      @Merrick Christian it did the trick and I finally got access to my account again. I'm so happy:D
      Thank you so much, you really help me out :D

    • @merrickchristian9392
      @merrickchristian9392 3 роки тому

      @Hunter Jameson Glad I could help :D

  • @hanihandoko7307
    @hanihandoko7307 2 роки тому +1

    Saya teringat masa kecil saya, sewaktu tinggal diwilayah Merak - Banten ada perusahaan Santa Fe.

  • @francescobaruffi999
    @francescobaruffi999 2 роки тому +3

    Does this fit on a Milwaukee drill?

  • @paqanini
    @paqanini Рік тому

    very good explanation, thanks a lot, great job!

  • @ralph5450
    @ralph5450 3 роки тому +1

    Can't wait till they have a DIY kit.

  • @kelleyroberts6017
    @kelleyroberts6017 7 місяців тому +1

    Sounds similar to The Improved TunnelVision Mole.

  • @mingfeng6104
    @mingfeng6104 3 роки тому +1

    Some one said it worked with slower ROP compared with SLB PD Archer or orbit. Is that true?

    • @notyourbusiness8550
      @notyourbusiness8550 Рік тому +1

      I worked in Halliburton and Schlumberger and I can say that slb equipment is the best.

  • @ppalten61
    @ppalten61 5 років тому +1

    What sizes are available? 4 3/4'' with 5 7/8'' to 7'' bit size 6 3/4'' with 8'' to 11 5/8'' bit size, 8'' with 12'' to 14'' bit size and 9 1/2'' body with 14'' - 17 1/2'' bit size. What pad sizeas are available? Stabilizer above is always 1/8'' undergauged?
    How to measure ROP - is depth downlinked from surface? Does the tool need specific differential pressure from bit to have enough power for the pads? Means in case losses occur and planned flowrate has to be reduced, POOH and change configuration. Can this be done by changing an internal ring on the rigsite or only in the workshop? What happens in case a nozzle is plugged and pressure drop below iCruise increases above planned range - will that damage the internal parts of the iCruise and toll has to be POOH?
    With that Superflex what is the maximum DLS to be drilled with 4 3/4'' and 6 3/4'' tool? This Superflex can cause vibrations, so in case planned DLS is moderate, is there different flex designs available?

    • @OilfieldBasics
      @OilfieldBasics  5 років тому

      Hey Peter! I wish I could answer your questions man, but I would just suggest reaching out to someone at Halliburton. They could answer your questions better.

  • @mb4lunch
    @mb4lunch 4 роки тому +1

    Looooongah Haaardaaah and quickaaaah! Drill it baby!

    • @OilfieldBasics
      @OilfieldBasics  4 роки тому +2

      Someone's had a little too much caffeine. :P

  • @251Trioxin
    @251Trioxin 4 роки тому +1

    Let’s go Halliburton!!!

  • @freebird7284
    @freebird7284 3 роки тому +5

    now make a cutaway display model to show exactly what's going on inside

  • @jasonreyes6830
    @jasonreyes6830 4 роки тому +2

    Do y’all know where I could get a job in pipeline HDD I know how to calculations and I am a fast learner

    • @OilfieldBasics
      @OilfieldBasics  4 роки тому

      Thanks for the question, but unfortunately we don't work with any staffing agencies or job boards at the moment.

    • @jasonreyes6830
      @jasonreyes6830 4 роки тому

      Oilfield Basics okay well if anyone ask I’m willing to relocate, my number is 281.759.0921

  • @omaral-subhi8514
    @omaral-subhi8514 5 років тому +12

    A copy of Schlumberger power drive push the bit system

  • @IrshadAhmad-mh1kg
    @IrshadAhmad-mh1kg 5 років тому +1

    Hope the new addition of RSS will improve Halliburton performance in GeoMarket for search of HC

  • @gislehildershavn399
    @gislehildershavn399 5 років тому +3

    I like it! ;o)

  • @mohamedalishafiqueahmed9496
    @mohamedalishafiqueahmed9496 2 роки тому

    i need to make drill to make a duct to more electric cabel duct

  • @mynameisnotshane6501
    @mynameisnotshane6501 2 роки тому

    how long can that bit work before it need to be replaced

    • @user-pb4qh5xp6c
      @user-pb4qh5xp6c 6 місяців тому

      It depends on the formation. We drilled over 15,000 feet in a single run in the Eagle Ford shale in 2014. I'm sure there's been longer runs. On a six well drilling pad, we drilled all six surface hole sections with one BHA and bit, for nearly 24,000 feet. The bit looked new except for the worn paint. The surface hole section in south Texas is like drilling through a snow bank.

  • @mohamedalishafiqueahmed9496
    @mohamedalishafiqueahmed9496 2 роки тому

    i also looking a project 500 km area its need 100 nos ro water source may be help me on thath project well driling at at least 100 stn.well water to the Land craft logestic project

  • @jeremybrooks335
    @jeremybrooks335 5 років тому +2

    It would rock better with a Ulterra Bit 🤷🏾‍♂️

  • @vahidhemati6626
    @vahidhemati6626 2 роки тому

    Anyone knows the how much is it?

  • @darrellkavanagh7373
    @darrellkavanagh7373 3 місяці тому

    Hmmmmm...is that Hal or just SLB PD knockoff ?

  • @ForeverEvicted
    @ForeverEvicted 2 роки тому

    The bit should steer. No, or minimal, Bit to Sensor= zoro projection ahead.

  • @carlitoab
    @carlitoab 3 роки тому +3

    Fascinating! Renewables is such a bland industry in comparison.

    • @OilfieldBasics
      @OilfieldBasics  3 роки тому

      Haha! Well said.

    • @tongpoo8985
      @tongpoo8985 3 роки тому +1

      It really is. It's a scam tbh. Nuclear is the only viable replacement for fossil fuels. Solar and wind are about 30 years too young.

    • @Jennaehill
      @Jennaehill 2 роки тому

      FYI this kind of drilling is used for renewables too (deep geothermal)

    • @carlitoab
      @carlitoab 2 роки тому

      @@Jennaehill true. Geothermal is very interesting. About the only form of renewable energy that we may rely on.

  • @3rdGenRX7TT
    @3rdGenRX7TT 3 роки тому +1

    Did he say "doddgy software" ?? 😁

  • @arlieferguson3990
    @arlieferguson3990 3 роки тому

    Fully Automated drilling

  • @3rdGenRX7TT
    @3rdGenRX7TT 3 роки тому +1

    They should call it i-Copy.. right at 4:49 he almost said AutoTrak 🤣😂🤣😂

    • @affliction337
      @affliction337 3 роки тому +1

      “No one will notice that we copied it if we paint it red and change the name.” Lol

    • @3rdGenRX7TT
      @3rdGenRX7TT 3 роки тому

      @@affliction337 🤣🤣😂😂🤣🤣😂🤣😂 Xeroxburton .. @ 1:00 Superflex...OMG... Looks exactly like the Baker AutoTrak Flex Sub

  • @yuyangli5281
    @yuyangli5281 5 років тому +2

    similar as atk

  • @jrpena7857
    @jrpena7857 Рік тому

    Looks like a fish waiting to happen

  • @tre6323
    @tre6323 4 роки тому

    Junk compared to what Baker Hughes Inteq has

  • @warningsigns4526
    @warningsigns4526 4 роки тому

    800 people lose job at Reno Halliburton - thedailyjobcuts.com - good riddance

  • @ygordupratserrano524
    @ygordupratserrano524 10 днів тому

    My english is terryble!