You guys should switch locomotives every 2 weeks to ease the stress on both. Or double head double head them.
they did a doubleheader a while back about a month ago.
I believe the idea was to run one and rebuild the other. 464 is coming due for it's 1472 inspection. I'm sure 152 will be out when 464 needs a boiler wash it other repairs. They can really only run one train at a time.
@@cple1 do you still work/volunteer at hrr? if you dont mid me asking
Boiler rebuilds are every 15 calendar years.Something to factor in.
You guys should switch locomotives every 2 weeks to ease the stress on both. Or double head double head them.
they did a doubleheader a while back about a month ago.
I believe the idea was to run one and rebuild the other. 464 is coming due for it's 1472 inspection. I'm sure 152 will be out when 464 needs a boiler wash it other repairs. They can really only run one train at a time.
@@cple1 do you still work/volunteer at hrr? if you dont mid me asking
Boiler rebuilds are every 15 calendar years.
Something to factor in.