Drawing Lots From Legal Descriptions Using ArcGIS Pro 2.7

Поділитися
Вставка
  • Опубліковано 4 вер 2024
  • Class lecture for completing lot drawing portion of campus map assignment

КОМЕНТАРІ • 8

  • @bobsage
    @bobsage 2 роки тому

    Fantastic video... I can't believe you don't have more likes!
    Thanks!

  • @gaeloriol2130
    @gaeloriol2130 2 роки тому

    Awesome video. Very concise and informative. Would love to see an updated video including the steps to get the bearings to show on the attribute table or just information in the description

    • @SJCDMAD232
      @SJCDMAD232  2 роки тому

      Thanks
      This video may help: ua-cam.com/video/ClQ8paAZEC8/v-deo.html

  • @billmarshall2536
    @billmarshall2536 5 місяців тому +1

    Why didn't you separate them into individual lots? You should start at the POB of a lot and return to that POB to finish that lot. Then start the next lot at its POB.

    • @SJCDMAD232
      @SJCDMAD232  5 місяців тому

      Sure, that would work too and probably easier. Not sure why I started with this particular method.

  • @Moose47
    @Moose47 2 роки тому

    How would you suggest completing the following curve in ArcPro? THENCE SOUTH 03°33'15" EAST 94.04 FEET TO A POINT ON A CURVE TO THE LEFT, THE
    RADIUS POINT BEING AN IRRIGATION PIVOT WHICH BEARS NORTH 86°26'45" EAST 1318.52
    FEET:
    THENCE EASTERLY ALONG SAID CURVE 4017.93 FEET:

    • @SJCDMAD232
      @SJCDMAD232  2 роки тому

      Start a traverse with the S 03-33-15 E; 94.04' line. Then in the next line type in "86-26-45rb" in the direction type-in, the enter 0 in the distance, then enter the radius and arc length, but since it's going left enter a negative (minus) sign in front of the radius.