Vyborg Float-over Project

Поділитися
Вставка
  • Опубліковано 21 жов 2024
  • Dockwise was responsible for laying out and installing the mooring spread, subcontracting, engineering and the execution of the floating-float-over." In short, total logistical project management.
    Short animation of the floatover for the Gazflot/Vyborg project. Vessels: Black Marlin & Transporter

КОМЕНТАРІ •