Nitin Gadkari is also doing Rs 1,00,000 cr (one lakh crore) road project delhi to mumbai. It's like miracle going there fastest ever road construction in world. This expressway is going to achieve some milestones definitely.
The chief guest (Speaker) is our Ex First MD (Mr. Achal Khare ) of NHSRCL. I have worked with him. Who is such a down to earth personality & also passionable about making india's first bullet train. Eargely waiting for 2nd Part.
Sir यह इन्टरव्यू के दौरान ये मुझे ये फील हो रहा था,की जो मोदीजी सीना ठोक के कभी कभी कहते है, "मुझे आप जानते नही " वो कॉन्फिडेंट और वह जिद मुझे हर उभर ते हुवे भारतीय में दिखती है जय हिंद
The Japanese are giving such a soft loan, but remember they will benefit from this in the long term - once one area has japanese bullet train tech, it will slowly expand to other parts of India - Japanese firms will profit from all this, long term !
Bhai sahab, jinka interview le rahe ho, unko uninterrupted bolne diya karo, you seem excessively over excited to pitch in & interrupt every 10 seconds. Not a good habit!
Excellent video. It graphically tells us about the challenges we face and the intellectual capacity we have to overcome them. This project will be a game-changer for us in many different fields. You have done very nice work and I hope you are being compensated well financially. My best wishes are with you.
To make our country India a developed nation by 2047, we should work with the target of building 500 kilometre bullet train network every year. हमारे देश भारत को 2047 तक विकसित राष्ट्र बनाने के लिये प्रति वर्ष 500 किलोमिटर बुलेट ट्रैन नेटवर्क बनाने का लक्ष्य रखकर काम करना चाहिये |
People can travel to/fro from Mumbai-Ahmedabad in a day. Great for business. You can work in trains without any issue. Far better than planes in these range of distances.
Mr Uddhav Thakre during his two and half years Chief Ministership with MVA Period did not allow Buulet train Project in Maharashtra State. He did not allocate land for the project. So Both Congress, Uddhav Thakre and NCP are oblivious of the huge loss they incurred to the Nation by adamantly, arrogantly denying saying Maharashtra can not afford Bullet Train Project, when Maharashtra has not paid money for Technology, or materials. He simply wanted only to oppose Modiji, BJP for sake of muslim favouring parties of Congress and NCP. Only when Eknath Shinde and Fadnavis came to Piwer the Bullet Train Project on Maharashtra side started, becauss they immediately sanctioned necessary permissions on the very first day of assuming office. Japanaese Government was very much worried for having extended very soft loan for Bullet Train Project for the Project was stalled by MVA partner Uddhav Thakre, knowing very well he is immensely harming Nations economic Growth and he simply opposed the project becauss it was initiated by Shri Narendra Modiji. These thugs, looters of MVA should not be elevted byaharashtra People if they have any sense of National Respect, and worry about Rapid Economic Growth of the Bharat Desh.
This is a great video with someone who has been involved with this project. There has been a question in my mind since some time. In this video, he says that it was decided that Sabarmati, Ahmedabad and Vadodara HSR stations will have connectivity with their railway stations. Why wasn't the same thing done for cities such as Surat, Bharuch, Anand/Nadiad? Surat HSR station is 12 kms from its railway station.
Sir, wrong train shown in the screenshot. We will be procuring 24 SHINKANSEN E5 series trains and the rest will be manufactured here. That's always voted as the most beautiful Bullet Train ever made. You're showing a different model in the thumbnail. I didn't watch the entire thing, but i thought I'll correct this
Inshahallah another gem from this cement company , looking forward for 2 episode . Please release soon . Hopefully you will cover some projects in Pakistan as well .
Learnt a lot of new things from this podcast , I usually don’t comment but this seriously fills my heart lots of positive emotions. Thank you JK team , hope you guys let this tree grow and nutrients it . Keep it up .
Unless bullet train track is above ground or completely fenced with sensors to detect any one breaching the fence, there would be major accidents. Otherwise People, animals, criminals can disrupt the services
Germany’s ICE (InterCity Express) runs at max 230 kmph Japan’s Maglev has already achieved 604 kmph Maglev China max speed is 430 kmph runs between Shanghai Puding Airport to Shanghai City Suburbs covering 32 kms in just 5 mins Maglev lifts from the base at 80 kmph and then runs on magnetic levitation Maglev is only available in China Japan n Germany China operating HSR with a max distance of 1332 kms from Beijing to Shanghai to Beijing at 320 kmph taking around 8 hrs - it’s called G Train
Many people get confused between HSR, Maglev & Hyperloop. They are all different from each other and also works on 3 different principles. Maglev & Hyperloop are failed projects across the world. India is building HSR (Bullet Train) with technological & financial assistance from Japan.
magnetic levitation train (maglev) line that operates in Shanghai, China. The line uses the German Transrapid technology.[2] The Shanghai maglev is the world's first commercial high-speed maglev and has a maximum cruising speed of 431 km/h (268 mph), making it the fastest train service in commercial operation.
Since my childhood I am forseeing my future in going back to my native place in Bihar from Delhi in 5 - 6 hrs to look after my ancestral property, would like to participate in agricultural productions, enhance the life of my village youngster. And also to bring my new youth to connect with their ancestral culture, practices, language, local chemistry, their way of thinking. If you bring Bullet train from all the way from Delhi to Calcutta will be more beneficial, way Vande Bharat Train has been patronised by all Indian people despite your commercial feasilibility between Ahemdabad and Mumbai. As today it takes around 13 - 15 hrs to reach Bihar from Delhi which kills the momentum to plan things and come back to delhi in no time. I am hopeful one day but really hurts why one day ..why not now.
Indonesia's bullet train was announced at the same time as India's bullet train. Today is their inaugural day! We are still on the drawing table and talking for last 4 years, which we are very good at. We like to count our chickens before they hatch.
Certainly, it appears that the distance between them is relatively short, and a significant portion of the engineering and technology they've employed originates from China. The primary cause of delay also stems from land acquisition, a complex issue influenced by political factors. It's worth noting that this situation is not unique to India; similar challenges are being encountered in Japan regarding the MagLev train project. So, please do not lose hope. A positive aspect is that we are acquiring technology rather than simply purchasing it.
Bhaiya jii bich main Bullet train ka Kam band Kar Diya gaya tha Pata hai ki nahi, yeah aapke pyare Opposition ne hi kiya tha, toh thoda bolne se pehle research bhi Kar lo bro, har bar galti nahi nikalte
We are also doing technology transfer, i.e after this we will be self sufficient to make bullet trains ourselves. Indonesians are entirely dependent on Chinese for their bullet train.
Hoga kaab ....its delayed by two years almost ...people do know bullet train it's called Shinkanshen....watch the Wolverine movie and you can see the glory...dont underestimate all of us.... bullet train was developed by the company who designed Kamakazi fighter plane.... fastest train is TGV of the France ...maglev is from German
@@shankars4281pehlay kaab hoga bolata...The deadline was advanced to have the bullet train go on its first run on 15 August 2022 on the occasion of India's 75th Independence day
@@shankars4281 nahi hoga yeh sarkar bhi beek gayee hain 😂🤣🤣🤣 pata nahi kaab hoga kyuki sarkar badlegi phir Gujarat hi delay karega ...like it did before for GST, Aadhar and rupee devaluation
@@Amarblr2004 Nah, Jis project ka Shilaanyaas Modi ji karthe hai, uska udghaatan bhi Modiji karthe hain. Who told it will be completed in 2022? Work itself started in late 2018. Then corona came.
@@Amarblr2004i think you Just think they think about a project and tell their assistants to do it it's not like that and the work is being delayed due to land aquasition 99.23 % in Gujarat and 98.61 % in Maharashtra you first need to get complete land and then the work get started although it get started in 2018 then corona came so i think it's going to complete till 2025 - 2027 aur bhaiya bohot planing lagti he in cheezon ko banane me but ek baar ban gai tou fir ham aram se pure india me 2035 tak all over india bana lenge
@host - Please ask some sensible questions. Most of your questions are childish. Requesting you to do some research beforehand only so that when you have the golden opportunity to have such knowledgeable guests, it can be utilised at its best. Just a humble request, do some research on the topics and questions.
We might be in a dreamlike state unless we alter our habits related to cleanliness and address various forms of pollution. It is essential to instill a sense of cleanliness in our children right from the beginning, and we should consider incorporating cleanliness-related subjects into the curriculum along with daily classroom cleaning-ness session. We can draw inspiration from Japan in this regards.
Why can't we improve services of Bombay VT trains. Why people should rush to enter trains. Can't we increase the frequency when there is so much rush. Is it technology problem?
Thank you Japan and then Priminister of Japan Mr. Abe Sir for this Cooperation.🙏🇯🇵🇮🇳
He is in heaven for years
Very few intelligent podcast in India and JK super podcast is on the top ..... such interesting and engaging content
Bro you look like shahid kapoor in this picture
@@stonedninja8190😂😂
Keep bringing Engineers like him who inspire India to become a technically advance country
Nitin Gadkari is also doing Rs 1,00,000 cr (one lakh crore) road project delhi to mumbai. It's like miracle going there fastest ever road construction in world. This expressway is going to achieve some milestones definitely.
Hope he builds one concrete road in our area. For the past 40 years we are suffering potholes.
@@prashantkatti118 due dec last no pot hole can seen on road
@@maharshianand8190 Do you know which area I am talking about?
@@prashantkatti118????
@@prashantkatti118 where do toh belong?
congress ko sabse bada malal ye rahega ki bullet train mein unhe corruption ya scam karne ka mauka nahi milega
Bilkul sahi bola bhai apne inko har kaam main scam 2g scam ka hii example lelo
@@bptecu क्या हुआ था 2g scam, जरा details बताओ, cag भी supreme court मे scam prove क्यू नही कर पाया❓ 🤔
Agar episode sahi se dekha hota toh pata chalta ki project 2013 mein approve ho Gaya tha...
@@dr.vikaskaranjekar2633sochie kis level ka scam hua ki cag ko bhi khareed liya gya.
Pata chalega sarkar badlne key baad
MD has explained in very simple and lucid langauge.
Tech part of bullet train track is well explained.
Thanks you sir.
Thank for this broadcast...... BHARAT ko no.1 economy hone se koi nahi rok Sakta
Bharat mata ki jay....
The chief guest (Speaker) is our Ex First MD (Mr. Achal Khare ) of NHSRCL. I have worked with him. Who is such a down to earth personality & also passionable about making india's first bullet train. Eargely waiting for 2nd Part.
Already uploaded sir
How to become like you?
@@amodmishra3030 75 day hard challenge 😅
Such an honour to have this conversation with such a great man
Sir
यह इन्टरव्यू के दौरान ये मुझे ये फील हो रहा था,की जो मोदीजी सीना ठोक के कभी कभी कहते है,
"मुझे आप जानते नही " वो कॉन्फिडेंट और वह जिद मुझे हर उभर ते हुवे भारतीय में दिखती है
जय हिंद
Every Indian should have one chance to ride in this train. Congratulations
Tab jake hi soch khulegi bhartiyon ki
Country will remember for ever
these engineers who are makers of this prestigious project 🎉
Congrats.Bullet Train AAJ Ki Jaroorat Hai. Thanks For Very Nice Video.
One of the most insightful podcast I have ever seen.
Such a Knowledgeable & Humble Man.👌👌
People were sleeping 75yrs now asking questions,Thank you Modiji for your efforts .....
Thank you Japan 🇯🇵
The interviewer kills it with intriguing questions. Very insightful video.
JK is doing a great job with such podcasts. Hats off!
The Japanese are giving such a soft loan, but remember they will benefit from this in the long term - once one area has japanese bullet train tech, it will slowly expand to other parts of India - Japanese firms will profit from all this, long term !
Great content. So nice to see someone putting in the effort to tell us about the infrastructure projects being taken up in India. A commendable job.
Bhai sahab, jinka interview le rahe ho, unko uninterrupted bolne diya karo, you seem excessively over excited to pitch in & interrupt every 10 seconds. Not a good habit!
People who are giving negative comments....
Ek bar aap...high qualified ke sath conversation kar ke dekho...
Sari hekdi nikal jayengi...
Jai Hind!!❤
Conservation nahi conversation
So true😂😂
@@sureshbhatia9408 thank, for autocorrect
@@VforVikramm 💯🙏
Knowledgeable content! Keep up the great work 👌
Another amazing podcast, waiting for the second one. I was always curious about bullet trains, thanks for finding such interesting guests!
Very interesting and insightful conversation. Looking forward to part 2.
One of best vlogs which is different from regular vlogs...thanks a lot for MD to explain in detail
Brilliant podcast
So much knowledge to gather❤️
Very informative session. Thank you to both of you sir.
Woah! Loved the episode. Cheers to the makers and JK Cement. Can't wait to see what they have in store for us next!
Excellent video. It graphically tells us about the challenges we face and the intellectual capacity we have to overcome them. This project will be a game-changer for us in many different fields. You have done very nice work and I hope you are being compensated well financially. My best wishes are with you.
To make our country India a developed nation by 2047,
we should work with the target of building 500 kilometre
bullet train network every year.
हमारे देश भारत को 2047 तक विकसित राष्ट्र बनाने के लिये
प्रति वर्ष 500 किलोमिटर बुलेट ट्रैन नेटवर्क बनाने का
लक्ष्य रखकर काम करना चाहिये |
People can travel to/fro from Mumbai-Ahmedabad in a day. Great for business. You can work in trains without any issue. Far better than planes in these range of distances.
Such a brilliance of our engineers ❤️
Mr Uddhav Thakre during his two and half years Chief Ministership with MVA Period did not allow Buulet train Project in Maharashtra State. He did not allocate land for the project. So Both Congress, Uddhav Thakre and NCP are oblivious of the huge loss they incurred to the Nation by adamantly, arrogantly denying saying Maharashtra can not afford Bullet Train Project, when Maharashtra has not paid money for Technology, or materials. He simply wanted only to oppose Modiji, BJP for sake of muslim favouring parties of Congress and NCP. Only when Eknath Shinde and Fadnavis came to Piwer the Bullet Train Project on Maharashtra side started, becauss they immediately sanctioned necessary permissions on the very first day of assuming office. Japanaese Government was very much worried for having extended very soft loan for Bullet Train Project for the Project was stalled by MVA partner Uddhav Thakre, knowing very well he is immensely harming Nations economic Growth and he simply opposed the project becauss it was initiated by Shri Narendra Modiji. These thugs, looters of MVA should not be elevted byaharashtra People if they have any sense of National Respect, and worry about Rapid Economic Growth of the Bharat Desh.
Sadist man. Good,gone
100%
Hope these clowns never return to power
The construction of bullet train track between Mumbai & Ahmedabad have single or double tracks?
HSR needs double track
You could see its progress if you visit ahemdabadh station.. there, I saw a double track only.
This is a great video with someone who has been involved with this project. There has been a question in my mind since some time. In this video, he says that it was decided that Sabarmati, Ahmedabad and Vadodara HSR stations will have connectivity with their railway stations. Why wasn't the same thing done for cities such as Surat, Bharuch, Anand/Nadiad? Surat HSR station is 12 kms from its railway station.
Excellent explanation by Khare sahab
Shinjo Abe ❤
Make a positive discussion on river linking projects - benefit & issues.....if possible invite Suresh Prabhu on this topic
Really amazing.. Through this, I got to know many unhidden facts regarding bullet train & it's journey
Inspiring podcast, makes you proud as an Indian
Maglev Shanghai me to operational hai..?
It is really small patch about 30km ,it run as airport express matro
Sir, wrong train shown in the screenshot. We will be procuring 24 SHINKANSEN E5 series trains and the rest will be manufactured here. That's always voted as the most beautiful Bullet Train ever made. You're showing a different model in the thumbnail. I didn't watch the entire thing, but i thought I'll correct this
Good channel for engineering sector
Things nobody will tell you about the bullet train. Ab lag raha hai aa hi hygi India me Bullet train . Eagerly waiting for the next episode 😍
Mind blowing 😮😮
Well j k ciment podkast and very very thanks for nhrsc md
Wow such a super interesting videocast. When is the 2nd part coming? बहुत ही रोचक एपिसोड। धन्यवाद की आपने हिंदी में इसे रिकॉर्ड किया ।
It should be only in English for international audiences
Inshahallah another gem from this cement company , looking forward for 2 episode .
Please release soon .
Hopefully you will cover some projects in Pakistan as well .
Abe chutye Pakistan meh kyu cover hoga
man of competence
Amazing content!!❤
यह एक शानदार प्रोजेक्ट है धन्यवाद जापान सरकार को और वहां के लोगों को
Learnt a lot of new things from this podcast , I usually don’t comment but this seriously fills my heart lots of positive emotions.
Thank you JK team , hope you guys let this tree grow and nutrients it . Keep it up .
Amazing podcast!!
being a fresher civil engineer i can relate alot what i have read in college with his practical knowledge
Bullet train, waiting for it impatiently. Need delhi chandigarh
You’re right. I think Agra to Amritsar-A2 would be perfect route. Daily high income travel local/tourist very much high.
Ehst mis theaccountability of yhe cabinet kn the process?
In the end very stupid questions were asked but the answers to these questions were so great and knowledgeable, great podcast 🙌🏻
True
Good information. Common people should know this and also students .
Ek no bhaiya common man ka sawal 😂😂🙏🙏
Bhai bich bich mey kitna bolte ho
Unless bullet train track is above ground or completely fenced with sensors to detect any one breaching the fence, there would be major accidents. Otherwise People, animals, criminals can disrupt the services
Fantastic initiative, get more people from other industries, perhaps someone from NHAI, NCRTC, etc
Deputation se NHSRCL mae posting ho sakta hai kya
Ha
How eill the vist ofthe ltoject be repaid?
Very very speed work....im gujrat....
What about the punctuality in Indian-Japanese bullet train?
Germany’s ICE (InterCity Express) runs at max 230 kmph
Japan’s Maglev has already achieved 604 kmph
Maglev China max speed is 430 kmph runs between Shanghai Puding Airport to Shanghai City Suburbs covering 32 kms in just 5 mins
Maglev lifts from the base at 80 kmph and then runs on magnetic levitation
Maglev is only available in China Japan n Germany
China operating HSR with a max distance of 1332 kms from Beijing to Shanghai to Beijing at 320 kmph taking around 8 hrs - it’s called G Train
Love you bhai amara delhi to Kolkata chai😀
Many people get confused between HSR, Maglev & Hyperloop. They are all different from each other and also works on 3 different principles.
Maglev & Hyperloop are failed projects across the world.
India is building HSR (Bullet Train) with technological & financial assistance from Japan.
Waiting
Do we have plan to extend the Bullet train on different line.
Ahmedabad to Delhi next stage
Unlikely. Right now Bullet train in India is not financially viable.
Kaise😂😂 @@chitharanjans4913
Ise project ke chakar me toh shiv sena ko tutwa diya 😂😂😂
Aditya thakre crying in corner
Bruh for real mumbai is a shit hole since years becuz of shiv
magnetic levitation train (maglev) line that operates in Shanghai, China. The line uses the German Transrapid technology.[2] The Shanghai maglev is the world's first commercial high-speed maglev and has a maximum cruising speed of 431 km/h (268 mph), making it the fastest train service in commercial operation.
Delhi chandigarh. Will make them one city. Amazing. We need bullet trains
@@induchopra3014 He is talking about maglev train. BTW, Shanghai maglev is a failed project.
सर को मेरा प्रणाम ❤
Thank you Japanese People, if you are watching we love you
giving their old technology to us and shifting to 500 kmph bullet train is always a win win situation for japan
India can't afford their maglave tech. 500km of maglave price India can build 5000km bullet train track.
Today these bullet train are much more advanced than earlier. Can reach speed over 450+ max.
Sir China shanghai main hai sir maglev train
Please do not intrupt the guest repeatedly during conversation
@02:47 sir main bhi thoda knowledgeable hu...👏👏👏👏👏👏
Very interesting channel
Since my childhood I am forseeing my future in going back to my native place in Bihar from Delhi in 5 - 6 hrs to look after my ancestral property, would like to participate in agricultural productions, enhance the life of my village youngster. And also to bring my new youth to connect with their ancestral culture, practices, language, local chemistry, their way of thinking. If you bring Bullet train from all the way from Delhi to Calcutta will be more beneficial, way Vande Bharat Train has been patronised by all Indian people despite your commercial feasilibility between Ahemdabad and Mumbai. As today it takes around 13 - 15 hrs to reach Bihar from Delhi which kills the momentum to plan things and come back to delhi in no time. I am hopeful one day but really hurts why one day ..why not now.
Bhai, flight le lo aur Lalu jaise ko elect kar do.. when u can’t elect proper leadership then don’t expect development..
💯💯💯...
Indonesia's bullet train was announced at the same time as India's bullet train. Today is their inaugural day!
We are still on the drawing table and talking for last 4 years, which we are very good at. We like to count our chickens before they hatch.
Certainly, it appears that the distance between them is relatively short, and a significant portion of the engineering and technology they've employed originates from China. The primary cause of delay also stems from land acquisition, a complex issue influenced by political factors. It's worth noting that this situation is not unique to India; similar challenges are being encountered in Japan regarding the MagLev train project. So, please do not lose hope. A positive aspect is that we are acquiring technology rather than simply purchasing it.
105 km aur 495 km me antar malum hai ya gadhe ho
Bhaiya jii bich main Bullet train ka Kam band Kar Diya gaya tha Pata hai ki nahi, yeah aapke pyare Opposition ne hi kiya tha, toh thoda bolne se pehle research bhi Kar lo bro, har bar galti nahi nikalte
We are also doing technology transfer, i.e after this we will be self sufficient to make bullet trains ourselves. Indonesians are entirely dependent on Chinese for their bullet train.
The anchor should learn to listen !! He talks loudly and interrupts the guest ,when important things are being said
Thank you
Sir mein pune jammu tawi exp ke toilet mein hu abhi, pani nahi aa raha kya karu?? Akela travel kr raha hu😨😕
Bro knows aerodynamic but not eleveted 👀👀
Hi Team...can you please invite ICMR, NIV and Bio-Tech scientist for their innovation interview
Aab to hyperloop bhi aa gyi, manglev train se bhi fast
Italian trains we experienced run at 350 to 400 KM per hour, but we hardly feel it is so fast.
Hoga kaab ....its delayed by two years almost ...people do know bullet train it's called Shinkanshen....watch the Wolverine movie and you can see the glory...dont underestimate all of us.... bullet train was developed by the company who designed Kamakazi fighter plane.... fastest train is TGV of the France ...maglev is from German
2026-27
@@shankars4281pehlay kaab hoga bolata...The deadline was advanced to have the bullet train go on its first run on 15 August 2022 on the occasion of India's 75th Independence day
@@shankars4281 nahi hoga yeh sarkar bhi beek gayee hain 😂🤣🤣🤣 pata nahi kaab hoga kyuki sarkar badlegi phir Gujarat hi delay karega ...like it did before for GST, Aadhar and rupee devaluation
@@Amarblr2004 Nah, Jis project ka Shilaanyaas Modi ji karthe hai, uska udghaatan bhi Modiji karthe hain. Who told it will be completed in 2022? Work itself started in late 2018. Then corona came.
@@Amarblr2004i think you Just think they think about a project and tell their assistants to do it it's not like that and the work is being delayed due to land aquasition 99.23 % in Gujarat and 98.61 % in Maharashtra you first need to get complete land and then the work get started although it get started in 2018 then corona came so i think it's going to complete till 2025 - 2027 aur bhaiya bohot planing lagti he in cheezon ko banane me but ek baar ban gai tou fir ham aram se pure india me 2035 tak all over india bana lenge
Suggest when we travel Japan buy JR RAIL PASS WE CAN TRAVEL UNLIMITED TIME IN BULLET TRAIN
@host - Please ask some sensible questions. Most of your questions are childish. Requesting you to do some research beforehand only so that when you have the golden opportunity to have such knowledgeable guests, it can be utilised at its best. Just a humble request, do some research on the topics and questions.
We are tired because of somany missing deadlines for all infrastructure projects.Hope Indian cities developed dust free clean cities after 100 years
We might be in a dreamlike state unless we alter our habits related to cleanliness and address various forms of pollution. It is essential to instill a sense of cleanliness in our children right from the beginning, and we should consider incorporating cleanliness-related subjects into the curriculum along with daily classroom cleaning-ness session. We can draw inspiration from Japan in this regards.
Piller already start.....
खरे साहेब खूप खूप धन्यवाद
2025 ते 2027 मध्ये मुंबई मेट्रो मधील अश्विनी मॅडम यांना बुलेट ट्रेन project मध्ये घ्या.
Bullet train nose is also for noise reduction… when it happens in tunnels…
‘Common man wale’ questions common man wale nahi bacho wale hai pls
For tourist it’s very economic
Kitne tourist destination hai Ahemdabad mein?
@@ashwajeetkamble6962bhut saare
Host please speak less and don't interrupt the guest while talking.
Why can't we improve services of Bombay VT trains. Why people should rush to enter trains. Can't we increase the frequency when there is so much rush. Is it technology problem?
Who is here after think school vedio 😊