Part 6 - Rural Water Supply Drill - Preston, Maryland - August 2024
Вставка
- Опубліковано 23 гру 2024
- An early clip from one of two fill sites used for the drill. Cambridge's engine crew is seen here building out the first suction line with the intent on getting the second in place as soon as possible using the driver side intake. The 2250 gpm pumper has plenty of pumping ability once water is accessed.