"Struma" highway in Bulgaria - Lot 3.1 (04.12.2022)

Поділитися
Вставка
  • Опубліковано 22 гру 2022
  • Drone video of the construction of the Struma highway Lot 3.1 - near Simitli
    Lot 3.1 from Blagoevgrad to Krupnik includes the construction of a motorway from km 359+000 to km 376+000. It is conventionally divided into two sections - section 1 from km 359+000 to km 366+000 /7 km/, and section 2 from km 370+400 to km 376+000 /5.6 km/. Among them, the construction of the "Zheleznitsa" tunnel is planned, which will be implemented by the DZZD "AM Struma tunnel 2018", with participants "GP Group" AD, "Global Construction" OOD and "Via Plan" EOOD, has been selected as the contractor of 2.28 km "Zheleznitsa" tunnel, a tunnel road at the southern portal of the facility and a helicopter pad with 99.96 points, is indicated in the API decision.
    Lot 3.1 Blagoevgrad - Krupnik - (12.6 km)
    The project includes the construction of two sections and a tunnel
    section 1 from km 359+000 to km 366+000 /7 km/
    section 2 from km 370+400 to km 376+000 /5.6 km/
    "Railway" tunnel: from km 366+000 to km 370+400 /2.6 km/
    Total length: 17 km
    29 m gauge freeway (without the tunnel)
    The price of the tunnel alone is 185,370,370. BGN 37 without VAT.
    #blagoevgrad #struma #simitli #bulgaria #greece #skypoint
    Video: Struma Highway construction - Lot 3.1
    Video Format: 4k
    Date: 04.12.2022
    Music: Bensound
    Redistribution is NOT allowed. Any reproductions or distributions of content elsewhere is violation of the licence under which this video is available on UA-cam platform

КОМЕНТАРІ • 18

  • @just_dimi3
    @just_dimi3 Рік тому +4

    Great 🔥 🇧🇬
    Greetings from Serbia 🇷🇸

  • @tsvetanradkov
    @tsvetanradkov Рік тому +12

    Браво ! Дано по този начин се реши проблема ...

  • @branimiravramov4944
    @branimiravramov4944 Рік тому +2

    Браво! 😃

  • @borislavdjonov9067
    @borislavdjonov9067 Рік тому +5

    Доколкото разбирам "отнемат" от земната маса за да намалят откоса. Знае ли се дали ще има бетонни укрепления или друг тип?

  • @gotqn2103
    @gotqn2103 Рік тому +3

    Браво, първи!

  • @kazantzidis60
    @kazantzidis60 Рік тому +3

    why noone is working on the site so many years?

  • @user-wk7bj7ze1p
    @user-wk7bj7ze1p Рік тому +5

    Снимай лот 1 на хемус!

  • @kingbuzzo28
    @kingbuzzo28 Рік тому +4

    Hi bulgarian friends! When will this section be opened?

    • @skyPointBG
      @skyPointBG  Рік тому +10

      After 1-2 years. Wrong construction design led to the need to redesign the sections before and after the tunnel. This video shows the consctructions only on one of the tunel sides (southern of the tunel). On the other one (northern) there are still no construction works and it's unknown then they will start. Also the proposed project of the northern part will require 1-2 years of construction time.

  • @cosmintalea9873
    @cosmintalea9873 Рік тому +3

    At least, the tunnel part is ready ?

    • @user-vq1gs4yx2g
      @user-vq1gs4yx2g Рік тому +1

      Yes! Look video winter 2021!

    • @skyPointBG
      @skyPointBG  Рік тому +5

      Yes, the entire tunnel and the bridges before and after are ready.

  • @mikeeb777
    @mikeeb777 Рік тому +1

    Hi! So there's no news on when this section of the highway will be open?

  • @b1rzam
    @b1rzam Рік тому +2

    Пффф доста копане има още

  • @Mzert805
    @Mzert805 Рік тому +1

    Един ден...