Nexans Euromold 430TB Tee Connector 12kV-36kV 630 Amps

Поділитися
Вставка
  • Опубліковано 3 гру 2024

КОМЕНТАРІ • 8

  • @5millman
    @5millman 6 місяців тому

    What should the stud torque value be?

  • @Tony-pl1vp
    @Tony-pl1vp Рік тому

    the outer black cap should be put and clicked down so no air is there. I tried without pressing it down and you start getting PD.

  • @SuperUrmeli
    @SuperUrmeli 8 років тому

    I don`t understand why Nexans Euromold doesn`t use the same system from the 300mm² cables for the 95-240mm² cables. It`s so much easier to put the srew in the switch box first instead of holding the tee connector the whole time and try to get the screw inside.
    Moreover slips the outer body slowly from the first unit. That doesn`t helps much to get screw in.

  • @rabahzouaoui9419
    @rabahzouaoui9419 Рік тому

    Tra duire en français avec les côtes de denudage et demie conducteure

  • @rabahzouaoui9419
    @rabahzouaoui9419 Рік тому

    Présenter les côtes s v p et faite la présentation claire

  • @rabahzouaoui9419
    @rabahzouaoui9419 Рік тому

    Tra duiser en français avec les côtes de denudagr

  • @rabahzouaoui9419
    @rabahzouaoui9419 Рік тому

    Traduire en francais avec côtes de denudage