DCVG | Pipeline Survey Techniques

Поділитися
Вставка
  • Опубліковано 17 жов 2024

КОМЕНТАРІ • 10

  • @amineboutlikhetingenieurel8220
    @amineboutlikhetingenieurel8220 9 місяців тому +1

    Thank you. Frome Algeria

  • @boutlikhetamine4991
    @boutlikhetamine4991 9 місяців тому +1

    Thank you so much . Frome Algeria too,

  • @AmeltonGsairus
    @AmeltonGsairus Рік тому

    Unbelievable informative video, thank you so much for your valuable contribution!!

  • @abdelkrimbenq2217
    @abdelkrimbenq2217 Рік тому

    How much current magnitude can be applied for DCVG survey more then normal functioning current especially in dry environment like desert.and if it can creat an overprotetion is acceptable or not.thank you.

  • @mouradaissat1235
    @mouradaissat1235 Рік тому

    very goog explanation, Regards

  • @paolapostigo1193
    @paolapostigo1193 3 роки тому +1

    Thanks for this video.

  • @abdelkrimbenq2217
    @abdelkrimbenq2217 2 роки тому

    Vert interesting subject,Thank you

  • @darrenmaley5436
    @darrenmaley5436 2 роки тому

    Great talk. Is it not possible to size defects against a coupon of known size?

    • @isifundi
      @isifundi  2 роки тому

      hank you for your question Darren.
      The relative sizing of defects is dependent on a number of factors and is unique to each pipeline.
      If the pipeline in question had suitably sized coupons installed, and these are bedded in the same backfill as the pipe, it may be possible to use these to correlate with the %IR readings.
      However, in the majority of instances, calibration digs are undertaken of a selection of different %IR - to verify the defect size vs %IR and determine what %IR should be repaired.
      We hope that answers your question adequately.
      Feel free to contact Isinyithi if you need further assistance. (pipeline@isinyithi.co.za)

  • @williamdieffenbach3264
    @williamdieffenbach3264 2 роки тому

    Thankfully the DCVG equipment now is electronic and the mV difference is easy to record.