Seymour Reservoir Debris Boom

Поділитися
Вставка
  • Опубліковано 13 лип 2022
  • Metro Vancouver crews are installing a 580 metre long debris boom mid-lake in the Seymour Reservoir to protect the Seymour Dam from potential blockage or damage caused by woody debris. As rugged as the surrounding environment, it's engineered and anchored to withstand thousands of pounds of debris, ice, wind, and even floods in the Seymour Water Supply Area.
    Upgrades and maintenance are a regular part of the water system to maintain the quality and reliability of clean drinking water to the region.
    www.metrovancouver.org/services/water

КОМЕНТАРІ •