LPEA Pole Replacement Stage One
Вставка
- Опубліковано 16 вер 2024
- Here is a time-lapsed video featuring LPEA linemen in the first stage of replacing a damaged utility pole in Bodo Park that supports two three-phase electric distribution lines. The LPEA linemen are performing live-line work on energized high-voltage electric distribution lines carrying 12,470 volts phase-to-phase. The video was compressed from the original three-hour period. #LPEA #ThankALinemen #HotWork
Can we plz get part 2?
Thanks for reaching out. This was the only stage we got on video.
❤❤😂