LPEA Pole Replacement Stage One

Поділитися
Вставка
  • Опубліковано 16 вер 2024
  • Here is a time-lapsed video featuring LPEA linemen in the first stage of replacing a damaged utility pole in Bodo Park that supports two three-phase electric distribution lines. The LPEA linemen are performing live-line work on energized high-voltage electric distribution lines carrying 12,470 volts phase-to-phase. The video was compressed from the original three-hour period. #LPEA #ThankALinemen #HotWork

КОМЕНТАРІ • 3