Ha'nu'na Wharram Tehini
Ha'nu'na Wharram Tehini
  • 9
  • 15 377
Refit Episode 07 - Beam repaired and in!
In this episode, after having removed beam three, I repair it and replace it. Along the way I change direction to install it in a more simple, yet more effective way. Success!
Working on the water to refit my Wharram Tehini 51', Ha'Nu'Na I am refitting her with a new deck layout and Wharram rig, but first need to do repairs to the cabin roofs... under the massive beams. The beams also need inspected and in some cases repaired.
Переглядів: 2 040

Відео

Engine sled tests with electric outboard
Переглядів 6168 місяців тому
I built an engine sled using the Wharram design for such sleds. It’s basically like a mini boat and a transoms to mount the engine which can be lowered or raised to lif th engine out of the water when sailing or in when motoring. Ingenious. I’m testing it along with my Epropulsion electric out board, and taking my Tiki 26 out to her summer mooring. Enjoy!
Refit Episode 06 - First beam out!
Переглядів 8188 місяців тому
In this episode I discuss some lithium battery woes, change direction in my plans to support the beams, and get the first beam out! Working on the water to refit my Wharram Tehini 51', Ha'Nu'Na I am refitting her with a new deck layout and Wharram rig, but first need to do repairs to the cabin roofs... under the massive beams. The beams also need inspected and in some cases repaired.
Tiki 26 Last sail of the season! Off to the winter mooring
Переглядів 525Рік тому
A lovely winter sail to Ballydehob, and learning the best transit passage between Castle Island and Horse Island in the west cork isles.
Refit 05 - discussion of Wharram Beam design
Переглядів 7 тис.Рік тому
In this episode I discuss the ideas behind the changes I need to make to refit my Tehini due to overlooked aspects I've found in the original build. I go over the plans, and then being building the elements that will make up some of the changes needed in my own workshop in Northern Ireland.
Refit 04 Shifting the pods & releasing a beam
Переглядів 995Рік тому
In this episode I move the two pods and the mizzen mast step off the deck with the help of Paddy Hegarty, and release one of the beams to discover something is missing! What the #%*! , then back to the drawings... Music from: In the Forest; lesfm.net/track/in-the-forest-acoustic-indie-no-copyright-free-background-music/ Untuk lagu populer lainnya silahkan kunjungi : www.jednota.info , Inspirati...
Refit 03 prepping to remove the pods
Переглядів 990Рік тому
In this episode I prepare to remove my pods as well as attempt to get my outboard off it's mount, with challenges and considerations as I go.
Wharram Tehini 51' Prepping to remove the mast step: Refit 01
Переглядів 1,5 тис.Рік тому
In this first episode I struggle through the process of removing the large mainsail mast step from my Wharram Tehini 51'. I explore how to remove it, discuss some of the reasons why I'm doing so and find my way through towards it's removal.
Refit 02 Moving electrics
Переглядів 495Рік тому
Moving my electrics on my Wharram Tehini 51' Ha'nu'na. Discussing the challenges and snags to do with Lithium Ion batteries.