Civil Positive
Civil Positive
  • 113
  • 819 715
PM Modi to inaugurate India's longest cable-stayed bridge 'Sudarshan Setu' on Feb 25, 2024,
PM Modi to inaugurate India's longest cable-stayed bridge 'Sudarshan Setu' on Feb 25, 2024, Connecting Okha & BEYT-DWARKA, Gujarat
Prime Minister #Narendra Modi will on February 25 dedicate to the nation, Sudarshan Setu, India's longest cable-stayed bridge connecting Okha mainland and Beyt Dwarka island. The inauguration will be done during his visit to Gujarat slated for February 24 and 25.
The bridge will ease the transportation and significantly reduce the time of devotees travelling between Dwarka and Beyt-Dwarka.
All you need to know about the Sudarshan Setu bridge:
1. The bridge has been built at a cost of around Rs 980 crore.
2. It is the longest cable-stayed bridge in the country of around 2.32 kilometres.
3. Sudarshan Setu boasts a unique design, featuring a footpath adorned with verses from Shrimad Bhagavad Gita and images of Bhagwan Krishna on both sides, according to an official statement.
4. It also has solar panels installed on the upper portions of the footpath, generating one megawatt of electricity.
5. Prior to the bridge's construction, pilgrims had to rely on boat transport to reach Beyt Dwarka. This bridge will also serve as a major tourist attraction of Devbhumi Dwarka.
#signature
#signaturebridge
#bridge
#bridgeconstruction
#highway
#india
#Longestcablestaybridge
Переглядів: 308

Відео

Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction | PART-3
Переглядів 1208 місяців тому
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction | PART-3 Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4 Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka #signaturebridge #cablestayedbridge #Civilpositive Title : Construction of new 4 Lane Signature bridge with 900m lon...
Signature Bridge -Connecting Okha & Beyt Dwarka - Cable Stay Bridge-India longest span Bridge PART 2
Переглядів 1439 місяців тому
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge PART 2 #Civilpositive #cablestayedbridge #signaturebrides The Okha-Beyt Dwarka Signature Bridge is an under construction cable-stayed sea bridge in India, connecting the Beyt Dwarka island in the Gulf of Kutch and Okha. The total length of the bridge is 2,320 metres (7,612 ft). Approval for the construction of the bridge was g...
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge - India longest span Bridge
Переглядів 2,3 тис.Рік тому
Signature Bridge - Connecting Okha & Beyt Dwarka - Cable Stay Bridge #Civilpositive #cablestayedbridge #signaturebrides The Okha-Beyt Dwarka Signature Bridge is an under construction cable-stayed sea bridge in India, connecting the Beyt Dwarka island in the Gulf of Kutch and Okha. The total length of the bridge is 2,320 metres (7,612 ft). Approval for the construction of the bridge was given by...
Signature Bridge..... Dwarka, Gujarat
Переглядів 95Рік тому
Signature Bridge..... Dwarka, Gujarat
Delhi - Mumbai Expressway | 1350km long| 8 lane Expressway | India longest Expressway | 8 Lane Wide
Переглядів 185Рік тому
Delhi - Mumbai Expressway | 1350km long| 8 lane Expressway | India longest Expressway | 8 Lane Wide #Delhi-Mumbaiexpressway #highwayconstruction #civilpositive The Delhi-Mumbai Expressway is a 1,350 km long, 8-lane wide (expandable to 12-lane) under-construction access-controlled expressway connecting India's national capital New Delhi with its financial hub Mumbai.[1][2][3][4] Foundation stone...
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA 2
Переглядів 313Рік тому
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA 2 #cablestayedbridge #bridge #civilpositive #Indiabridge #goaindia #largestbridge #bridgeconstruction #Highwaycumbridge #bridge, bridgerton season 1, bridge course, bridge music, #bridge drawing, bridge construction, bridge collapse, bridge race, bridge falling down, bridge and tunnel kiss, bridge ...
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA
Переглядів 598Рік тому
New Zuari Bridge (Monohar Setu)| 2nd longest and widest Cable -Stay Bridge in India | GOA , INDIA #civilpositive #cablestayedbridge #goaindia #signature #bridgeconstruction #bridgecourse #cable #highwayride #highwayconstruction #bridgeconstruction #Highwaycumbridge The New Zuari Bridge (Manohar Setu) Edit This is an under-construction cable-stayed bridge over Zuari River on the Panaji-Margao Na...
Signature Bridge Upper Cross Beam | Bridge Connecting Okha & Beyt-Dwarka, Gujarat| Cable stayed
Переглядів 539Рік тому
Signature Bridge Upper Cross Beam | Bridge Connecting Okha & Beyt-Dwarka, Gujarat| Cable stayed #cablestayedbridge #civilpositive #bridge #longestbridge #Indialongestbridge #signaturebridge #Okhagujrat #bridgeconstruction #cablestayedbridge #cable #delhiindia #bridgework #construction #highwayconstruction #morth #bridgeconstruction
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Casting Yard & RMC Plant
Переглядів 710Рік тому
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Casting Yard & RMC Plant Part:-8 #signaturebridge #cablestayedbridge #Civilpositive Title : Construction of new 4 Lane Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka including construction of approaches on new national highway no NH-51 in the state of Gujrat Associated Client : MO...
Kota Cable Stayed Bridge over river Chambal | Hanging bridge kota Rajasthan | Kota chambal bridge
Переглядів 219Рік тому
Kota Cable Stayed Bridge over river Chambal | Hanging bridge kota Rajasthan | Kota chambal bridge
4 Lane Signature Bridge -Aerial View | 3D Pylon | Okha-Beyt Dwarka Cable Stay Bridge |Ground Update
Переглядів 7932 роки тому
4 Lane Signature Bridge -Aerial View | 3D Pylon | Okha-Beyt Dwarka Cable Stay Bridge |Ground Update
Signature Bridge -Upper Cross Beam Reinforcement | Cable Stay Bridge| Under Construction Aerial View
Переглядів 1822 роки тому
Signature Bridge -Upper Cross Beam Reinforcement | Cable Stay Bridge| Under Construction Aerial View
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4
Переглядів 7 тис.2 роки тому
Signature Bridge - Okha-Beyt-Dwarka Cable Stay Bridge | Under Construction Aerial View | PART-4
Signature Bridge-Approach Road Construction |Aerial View| 4 Lane Highway Construction NH- 51| Part-3
Переглядів 1992 роки тому
Signature Bridge-Approach Road Construction |Aerial View| 4 Lane Highway Construction NH- 51| Part-3
Deck Installation Procedure | Signature Bridge Connecting Okha & Beyt-Dwarka - PART-2 | CABLE STAY
Переглядів 5 тис.2 роки тому
Deck Installation Procedure | Signature Bridge Connecting Okha & Beyt-Dwarka - PART-2 | CABLE STAY
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka
Переглядів 3,5 тис.2 роки тому
Signature Bridge Okha-Beyt-Dwarka Cable Stay Bridge | Signature Bridge Connecting Okha & Beyt-Dwarka
Mahatma Gandhi Museum Rajkot | PART-10| GALLERIES- 19 to 31| Mahatma Gandhi Chronology- 1944-1948
Переглядів 302 роки тому
Mahatma Gandhi Museum Rajkot | PART-10| GALLERIES- 19 to 31| Mahatma Gandhi Chronology- 1944-1948
Mahatma Gandhi Museum | PART-9| GALLERIES- 15,16,17 & 18| Mahatma Gandhi Chronology- 1930- 1944
Переглядів 242 роки тому
Mahatma Gandhi Museum | PART-9| GALLERIES- 15,16,17 & 18| Mahatma Gandhi Chronology- 1930- 1944
Mahatma Gandhi Museum Rajkot | PART-8| GALLERIES- 13 & 14| Mahatma Gandhi Chronology- 1920-1940
Переглядів 162 роки тому
Mahatma Gandhi Museum Rajkot | PART-8| GALLERIES- 13 & 14| Mahatma Gandhi Chronology- 1920-1940
Mahatma Gandhi Museum Rajkot | PART-7| Gallery-12| Mahatma Gandhi Chronology-1916-1920
Переглядів 532 роки тому
Mahatma Gandhi Museum Rajkot | PART-7| Gallery-12| Mahatma Gandhi Chronology-1916-1920
Mahatma Gandhi Museum- Rajkot | PART-6 |Galleries- 8,9,10&11| Mahatma Gandhi Chronology -1910-1916|
Переглядів 442 роки тому
Mahatma Gandhi Museum- Rajkot | PART-6 |Galleries- 8,9,10&11| Mahatma Gandhi Chronology -1910-1916|
Mahatma Gandhi Museum-Rajkot | Gallery-7| PART-5| Mahatma Gandhi Chronology-1893-1906| The Black Act
Переглядів 212 роки тому
Mahatma Gandhi Museum-Rajkot | Gallery-7| PART-5| Mahatma Gandhi Chronology-1893-1906| The Black Act
Mahatma Gandhi Museum Rajkot | Galleries 5 & 6 | PART-4| Mahatma Gandhi Chronology - 1887-1893
Переглядів 192 роки тому
Mahatma Gandhi Museum Rajkot | Galleries 5 & 6 | PART-4| Mahatma Gandhi Chronology - 1887-1893
Mahatma Gandhi Museum Rajkot || Galleries 3 & 4 || PART- 3|| Pietermaritzburg Railway Station
Переглядів 522 роки тому
Mahatma Gandhi Museum Rajkot || Galleries 3 & 4 || PART- 3|| Pietermaritzburg Railway Station
Mahatma Gandhi Chronology - 1869-1887 | Mahatma Gandhi Museum Rajkot | Galleries 1&2 | PART-2|
Переглядів 572 роки тому
Mahatma Gandhi Chronology - 1869-1887 | Mahatma Gandhi Museum Rajkot | Galleries 1&2 | PART-2|
Mahatma Gandhi Museum, Rajkot Gujarat | PART-1 |
Переглядів 1332 роки тому
Mahatma Gandhi Museum, Rajkot Gujarat | PART-1 |
Things To Check Before Casting Columns as Site Engineer || Columns Check Before Concreting
Переглядів 4232 роки тому
Things To Check Before Casting Columns as Site Engineer || Columns Check Before Concreting
Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka..NH-51
Переглядів 7332 роки тому
Signature bridge with 900m long central cable stayed module connecting Okha and Beyt Dwarka..NH-51
Column Reinforcement Details | Stirrups |Reinforcement Lapping zone & lapping length in column
Переглядів 2392 роки тому
Column Reinforcement Details | Stirrups |Reinforcement Lapping zone & lapping length in column

КОМЕНТАРІ

  • @refatferdous4246
    @refatferdous4246 Місяць тому

    Sir,Here, admixture using matter is not involved in ACI math example. Kindly give an example math and solutions of admixture using calculations Problems in ACI mix Design.

  • @vishalkumar-pk2bj
    @vishalkumar-pk2bj Місяць тому

    Is code 2019 ke according hi kya

  • @rohithavanur9879
    @rohithavanur9879 2 місяці тому

    Thoda calculation samjha dijiye 1.Specific gravity of cement with respect to kerosene? 2. Specific gravity of kerosene with respect to water? 3. Specific gravity of cement with respect to water? Aap to 1st &2nd wala bola hai 3rd ?

  • @CROW-pu9vc
    @CROW-pu9vc 3 місяці тому

    In %of reinforcement at ast 524/2

  • @karimtripura2637
    @karimtripura2637 5 місяців тому

    Sir minimum Reinforcement should be 0.12℅ bcoz u have used Fe415 HYSD bar

  • @KajalKumari-wh4oc
    @KajalKumari-wh4oc 6 місяців тому

    Sir can u explain me from where we get value of phi

  • @dce148rajeshkumarshaw4
    @dce148rajeshkumarshaw4 6 місяців тому

    Ye kya marathon hai 😂

  • @kshitijkumarkushwaha8903
    @kshitijkumarkushwaha8903 7 місяців тому

    I recommend you not to watch this video if you are watching just before exam bcoz you will get confused instead watch engineer ki pathsala (it is lengthy ) but you will understand everything But this lecture was also good.

  • @kveditzz5054
    @kveditzz5054 8 місяців тому

    16) a) Design a concrete mix by BIS method with the following data : i. Characteristics compressive strength = 35N/mm2 ii. Maximum size of aggregate = 20mm (angular) iii. Fine aggregates confirm to grading zone II iv. Workability = 75mm slump v. Degree of quality control = Good, vi. Type of exposure = Mild (Plain Concrete) vii. Specific gravity of cement = 3.14 viii. Specific gravity of fine aggregate = 2.58 ix. Water absorption (i) Coarse aggregate = 1.9% (ii) Fine aggregate x. Water cement ratio = 0.48 Assume any other data if necessary. Also calculate the quantity of cement, sand, coarse aggregate and water required per cubic metre of concrete.

  • @souvik.fingtore
    @souvik.fingtore 10 місяців тому

    The word" teacher" meaning define by ur teaching style and explanation & thanks fram JADAVPUR UNIVERSITY.....😍

  • @riddhishsingh8648
    @riddhishsingh8648 10 місяців тому

    Dada Two way slab design ka video provide kegiye....

  • @brahmatejaballipalli3392
    @brahmatejaballipalli3392 Рік тому

    Nice explanation,but i cant understand sir how you can get the area of steel Ast please reply back

  • @user-gl4yf4ol1e
    @user-gl4yf4ol1e Рік тому

    Tq sir

  • @MIMO0351Q
    @MIMO0351Q Рік тому

    Noobri😂😂😂😂

  • @harsh_shukla1555
    @harsh_shukla1555 Рік тому

    Sir why for deflection check you have not multiply 1.3 as slab is in confinement?

  • @sravankumar14
    @sravankumar14 Рік тому

    Super sir

  • @nasarashraf
    @nasarashraf Рік тому

    nice 👍

  • @chirantanibiswas
    @chirantanibiswas Рік тому

    For slab design the basic value is on the page 39.

  • @teja1424
    @teja1424 Рік тому

    Design the concrete mix for the following data: characteristic compressive strength = 35MPa, maximum size of aggregate =20mm (angular), Degree of workability = 0.9 CF, Degree of quality control = good and type of exposure = severe. Water absorption by CA = 1% and moisture content in FA=1.5%.Assume any suitable missing data.

  • @insideouttek2361
    @insideouttek2361 Рік тому

    Simply support q liya

  • @Belowaverage541
    @Belowaverage541 Рік тому

    Thankyou sir bohot ache se explain kara apne

  • @bhubaneswarimohanty7465
    @bhubaneswarimohanty7465 Рік тому

    From where the clear cover value came sir ?

  • @aashishdas9981
    @aashishdas9981 Рік тому

    Slab Ka area of rf 0.12 % of cross sectional area hota h

  • @aashishdas9981
    @aashishdas9981 Рік тому

    Dead load and live loads have different unit,then how can they be added? One is in n\m and other is in n\mm^2

  • @shashankda1930
    @shashankda1930 Рік тому

    Thank you soo much sir...., 💗

  • @nasarashraf
    @nasarashraf Рік тому

    Good

  • @Hello_family111
    @Hello_family111 Рік тому

    Worst cam quality with good explanation

  • @viralvideoshort603
    @viralvideoshort603 Рік тому

    Good project

  • @ajayahirajay7349
    @ajayahirajay7349 Рік тому

    Jay Dwarkadhish

  • @ashoksanghvi7126
    @ashoksanghvi7126 Рік тому

    Very nice 👌

  • @jatindadwal2492
    @jatindadwal2492 Рік тому

    When ur teaching is passion and not a work ! Loved ur explanation ❤️

  • @ASMohamedZiyath
    @ASMohamedZiyath Рік тому

    good

  • @ravishankars1420
    @ravishankars1420 Рік тому

    Looks like the bridge is ready in all respects to be opened to traffic, any idea when it is likely to happen..

  • @SuperMan-pv5ee
    @SuperMan-pv5ee Рік тому

    thankyou

  • @53piyushghagi28
    @53piyushghagi28 Рік тому

    Thank you

  • @prakashbhuyiar5106
    @prakashbhuyiar5106 Рік тому

    It was good explanation 😊

  • @sridharmaddamsetty3046
    @sridharmaddamsetty3046 Рік тому

    Very beautiful explanation to understand how to do experiments.......simple and clear ThanQ sir

  • @vishnuvirat1382
    @vishnuvirat1382 Рік тому

    why the b is taken as 1000 here

  • @moinkhan8920
    @moinkhan8920 Рік тому

    Clear cover values?

  • @kalpeshbadgujar666
    @kalpeshbadgujar666 Рік тому

    Hello Sir, In check for deflection the value of actual deflection is 29.41 and permisible value is 29 then it is safe or not ?

  • @se1-03-krushnkantjanardanb6

    Sir two way slab ka upload karo na

  • @vishalbaraiya7684
    @vishalbaraiya7684 Рік тому

    💯👍👍👍

  • @vishalbaraiya7684
    @vishalbaraiya7684 Рік тому

    Very good video Okha to bet Dwarka thank you very much

  • @teerthagauravyadav4524
    @teerthagauravyadav4524 Рік тому

    जय द्वारकाधीश, जय मोदी जी

  • @vijayraut4891
    @vijayraut4891 Рік тому

    Modification factor 1.55 how isn't it 1.35, Can u make me clear Pls ....

  • @D.G.-79
    @D.G.-79 Рік тому

    How Much Time Will be Taken For Completion of The Project??

    • @civilpositive805
      @civilpositive805 Рік тому

      Next Year Complete approximately 65% to 75% work completed.......

  • @khushpreetKaur-yn4em
    @khushpreetKaur-yn4em Рік тому

    Tq sir😊👍

  • @kamleshmandal8757
    @kamleshmandal8757 Рік тому

    sir slab ko t clear cover 15 hunxa niii

  • @samikshasaoji5273
    @samikshasaoji5273 Рік тому

    Thank you sir ❤️

  • @alokjha2000
    @alokjha2000 Рік тому

    When project will completed