Atanu Dhar
Atanu Dhar
  • 65
  • 93 126
Delhi-Mumbai Expressway: Latest Milestone | Updates on Delhi-Mumbai Expressway | Atanu Dhar | Vlogs
Delhi-Mumbai Expressway: Latest Milestone
In this video,I have captured the Beautiful updates of Delhi Mumbai Expressway, a 1,350-km 08 lane access controlled highway.
The 08 lane Delhi Mumbai expressway will cover the Delhi Mumbai distance by passing through six states - Delhi, Haryana, Rajasthan, Madhya Pradesh, Gujarat and Maharashtra and several greenfield sites.
DELHI-MUMBAI EXPRESSWAY - the longest greenfield expressway, will have India’s first animal bridges or animal overpasses. It will be designed to keep the wildlife section unaffected from the new infrastructure. There will be around five such animal overpasses, with a combined length of around 2.5 kms, passing through Ranthambore wildlife corridor and Mukundra wildlife sanctuaries in Rajasthan.
It has been planned with a 120 km/h speed restriction with the option to add 12 lanes later.
Good news for Delhi-NCR commuters as the entire 59 km stretch from DND Flyway near Maharani Bagh to Delhi-Mumbai Expressway at Sohna is set to become operational by the end of this year.
This Expressway also nown by NE 4.
c to seamlessly interlink with major highways such as the DND flyways, Delhi-Meerut, Kundli-Manesar-Palwal (KMP), NH-2 (Delhi-Agra), Delhi Mumbai Expressway, and Jewar airport connectivity highway. Spanning over a distance of 33 km, the project will consist of a 6-lane access-controlled highway with 3-lane service roads on both sides in the brownfield stretch.
Expected completion time of The Delhi-Mumbai Expressway will be Oct2025.
Delhi-Mumbai Expressway offered a variety of roadside amenities, including hotels, ATMs, food courts, QSR like Burger King, Subway, and McDonald's, as well as retail outlets, Petrol Pumps, and charging stations for electric vehicles.
The Delhi-Mumbai Expressway would be a route that is friendly to the environment. Around twenty lakh trees would be covered by the motorway.
Pls don’t forget to subscribe my channel and press LIKE button.
Your Queries
What is the current status of Delhi-Mumbai Expressway?
What are the routes of Delhi-Mumbai Expressway?
What is the maximum speed of Delhi-Mumbai Expressway?
What is the width of Southern Peripheral Road?
Is bike allowed on Delhi-Mumbai Expressway?
Which cities are connected by Delhi-Mumbai Expressway?
#atanu #dhar #delhimumbaiexpresswayupdate #delhimumbaiexpresswayconstruction #delhi #highway #vlog #expressway #delhimumbaiexpressway #delhimumbaiexpresswaylatestnews #nhai #mumbai #bharatmalapariyojana #fasttag #tolltax
My UA-cam Gear-
Earphone - amzn.to/3BCMdb1
Mic - amzn.to/43bTsm6
Mini tripod - amzn.to/43aC3Kj
My Popular video link,
ua-cam.com/video/pHCIbBphtRA/v-deo.htmlsi=Wn3Ap989HwuoB5W-
ua-cam.com/video/5jctWWGCCYI/v-deo.htmlsi=OXb0vkpF28FHevpT
ua-cam.com/video/owQcCxrN0D0/v-deo.htmlsi=v5tN8O9_lXWXkgRw
ua-cam.com/video/sSesBv5Iq20/v-deo.htmlsi=vfZrZ-86drbf69_L
ua-cam.com/video/JKtMzg5QzWc/v-deo.htmlsi=oOw29ymLEEHV9QeU
Follow me on
Facebook: atanu.dhar.56/
Instagram: dharatanu?igshid=ZDdkNTZiNTM=
Business Email: atanudhar@rediffmail.com
Переглядів: 2 747

Відео

Delhi-Amritsar-Katra Expressway: Infrastructure and Updates | Episode 3 | Atanu Dhar | Vlogs
Переглядів 94021 день тому
The Delhi-Amritsar-Katra Expressway Phase 1, particularly Package 1, is a critical infrastructure project aimed at significantly reducing travel time between Delhi and Katra. It connects from Bahadurgarh border near Delhi with Katra in J&K via Haryana and Punjab. This expressway is a 670 km long greenfield project, with a construction budget of approximately ₹40,000 crore. Phase 1 involves the ...
Delhi-Amritsar-Katra Expressway- Ep 2 | Phase 1 Package 1 | Atanu Dhar | Vlogs
Переглядів 1,5 тис.28 днів тому
The 670 km Delhi-Amritsar-Katra Expressway project maintained by NHAI is an under construction 4-lane access-controlled road. It connects from Bahadurgarh border near Delhi with Katra in J&K via Haryana and Punjab. Covered balance part of Phase 1 Package 1 involves the construction of a 34 km greenfield expressway between Jasaur kheri village to Rukhi pana village. Delhi-Amritsar-Katra Expressw...
Delhi-Amritsar-Katra Expressway | Updates on Ph 1 Package 1 | Atanu Dhar | Vlogs
Переглядів 3,6 тис.Місяць тому
The 670 km Delhi-Amritsar-Katra Expressway project maintained by NHAI is an under construction 4-lane access-controlled road. It connects from Bahadurgarh border near Delhi with Katra in J&K via Haryana and Punjab. Phase 1 involves the construction of a 397.7 km greenfield expressway between Delhi-Ludhiana-Gurdaspur and a 99 km spur connecting between Nakodar and Amritsar. It is a combination o...
Delhi-Dehradun Expressway Phase 2 | Latest Updates | Atanu Dhar | Vlogs
Переглядів 4,2 тис.Місяць тому
The Delhi-Dehradun Expressway is a 210 kilometre long, 12&6 lane access-controlled expressway, which will connect Delhi with Dehradun, the capital of Uttarakhand. In this video, I’ve covered from EPE Junction to Baghpat near Nirojpur village. Distance between EPE interchange to Baghpat around 10km. The Delhi Dehradun expressway Phase 2 is a green field project which covers 118 km distance from ...
Delhi-Dehradun Expressway | Latest Updates | Atanu Dhar | Vlogs
Переглядів 2,9 тис.2 місяці тому
The Delhi-Dehradun Expressway is a 210 kilometre long, 12&6 lane access-controlled expressway, which will connect Delhi with Dehradun, the capital of Uttarakhand. In this video, I’ve covered from Akshardham Temple, New Delhi to Delhi-UP border constructed by Gawar Constructions. Distance between Akshardham Temple, New Delhi to Delhi-UP border around 15km. Approximate built cost is 1300cr. Appro...
Pataudi to Rewari updates | Via NH 352W | Atanu Dhar |
Переглядів 4 тис.2 місяці тому
Pataudi to Rewari updates Gurgaon-Pataudi-Rewari highway updates Drive from Pataudi By pass to Rewari on NH 352W The 46Km long Gurgram-Pataudi-Rewari highway [NH 352W] project running very well. Estimated cost of this project is 1500 crore, the highway will have 81 culverts and 23 underpasses. The Highway started from Hero honda chowk,Gurugram and finished at Rewari via Pataudi. Once it operati...
Hero Honda chowk to NH 352W updates | Via Dwarka Expressway | Ep 4 | Atanu Dhar |
Переглядів 1 тис.3 місяці тому
Hero Honda chowk to NH 352W via Dwarka Expressway updates Gurgaon-Pataudi-Rewari highway updates Drive from Hero honda underpass thru Dwarka Expressway The route from Hero Honda Chowk to NH 352W via Dwarka Expressway is seeing significant updates and improvements. A key underpass on the Dwarka Expressway, which will connect Hero Honda Chowk with several sectors. This new underpass aims to ease ...
Gurgaon-Pataudi-Rewari highway | Updates | NH-352W | Ep 3 | Atanu Dhar |
Переглядів 2,7 тис.3 місяці тому
Gurgaon-Pataudi-Rewari highway updates KMP to Pataudi road construction updates I have started this video from KMP to Pataudi. Covered Gurgaon-Pataudi-Rewari highway construction site of 22Km Brownfield area, which starts from KMP Expressway to Pataudi. The NH-352W highway is being developed to connect Gurgaon, Pataudi, and Rewari, making up a 46-km stretch of road. I have also covered the 7km ...
Gurgaon-Pataudi-Rewari highway latest updates | NH-352W | Ep 2 | Atanu Dhar |
Переглядів 3,2 тис.4 місяці тому
Gurgaon-Pataudi-Rewari highway latest updates NH-352W Updates In this today’s video, I have tried to cover the section between Sector 87 and Western peripheral expressway. I have covered construction site of 6Km Greenfield area, which starts from Dwraka Expressway to Wazirpur Chowk. The NH-352W highway is being developed to connect Gurgaon, Pataudi, and Rewari, making up a 46-km stretch of road...
Gurgaon-Pataudi-Rewari highway Latest Update | NH-352W | रेवाड़ी-गुरुग्राम यात्रा होगी सुगम | Vlogs
Переглядів 2,7 тис.5 місяців тому
Gurgaon-Pataudi-Rewari highway latest updates The construction and widening of the highway resumed after a Supreme Court order allowed the National Highways Authority of India (NHAI) to restart the project. This development came after the project had been halted for some time due to heavy rainfall and BAN on construction work due to heavy pollution at Delhi NCR area. The NH-352W highway is bein...
Urban Night Drive on Dwarka Expressway | रात्रि का अनुभव: द्वारका एक्सप्रेसवे नाइट | Atanu Dhar |
Переглядів 3225 місяців тому
Urban Night Drive on Dwarka Expressway A night drive along Dwarka Expressway offers a captivating blend of urban charm and nocturnal tranquility. As the sun sets and city lights begin to illuminate the skyline, the expressway transforms into a mesmerizing pathway of twinkling lights and neon hues. The bustling energy of the city mellows into a serene ambiance, perfect for a leisurely exploratio...
Driving on Dwarka Expressway | विकास की दिशा: द्वारका एक्सप्रेसवे की यात्रा | Atanu Dhar | Vlogs
Переглядів 8475 місяців тому
Driving on Dwarka Expressway Driving on Dwarka Expressway offers a unique experience that blends convenience, connectivity, and urban exploration. As you embark on your journey, you're greeted by well-maintained lanes, modern infrastructure, and smooth roads that promise a comfortable ride. The Dwarka Expressway, a 29-km controlled-access expressway, is a significant infrastructural project tha...
Exploring the Heartbeat of Dwarka Expressway | द्वारका एक्सप्रेसवे:एक नए सफर की शुरुआत! | Vlogs |
Переглядів 2,3 тис.6 місяців тому
Exploring the Heartbeat of Dwarka Expressway Exploring the heartbeat of Dwarka Expressway is an immersive journey through a pulsating urban artery. The expressway, like a lifeline, connects various facets of modern living, and every drive along its lanes unfolds a vibrant tapestry of city life. The Dwarka Expressway, a 29-km controlled-access expressway, is a significant infrastructural project...
Speedscape Wonders: Delhi-Mumbai Expressway Magic | Updates on Delhi-Mumbai Expressway | Vlogs
Переглядів 5 тис.6 місяців тому
Delhi Mumbai Expressway, a 1,350-km controlled access highway, which would cut down the travel time between the two major cities from 24 hours to 12 hours. The foundation stone for the project was laid in March 2019 and is expected to be completed by December 2024. The 08 lane Delhi Mumbai expressway will cover the Delhi Mumbai distance by passing through six states - Delhi, Haryana, Rajasthan,...
SPR Gurgaon's Redevelopment Update| Gateway Between Dwarka Expressway and Faridabad | Atanu Dhar |
Переглядів 2,1 тис.7 місяців тому
SPR Gurgaon's Redevelopment Update| Gateway Between Dwarka Expressway and Faridabad | Atanu Dhar |
Latest Developments on Delhi-Dehradun Expressway | Phase 1 Package 1 | Atanu Dhar | Vlogs
Переглядів 6 тис.7 місяців тому
Latest Developments on Delhi-Dehradun Expressway | Phase 1 Package 1 | Atanu Dhar | Vlogs
Dwarka Expressway's Latest Phase | तेजी से बढ़ती प्रगति: द्वारका एक्सप्रेसवे की अपडेट्स | Vlogs |
Переглядів 2,1 тис.8 місяців тому
Dwarka Expressway's Latest Phase | तेजी से बढ़ती प्रगति: द्वारका एक्सप्रेसवे की अपडेट्स | Vlogs |
Delhi-Mumbai Expressway: Path to Jewar International Airport | Atanu Dhar | Vlogs
Переглядів 9208 місяців тому
Delhi-Mumbai Expressway: Path to Jewar International Airport | Atanu Dhar | Vlogs
Latest Updates of Dwarka Expressway | Launched Vatika Chowk Underpass | Atanu Dhar | Vlogs
Переглядів 4,3 тис.9 місяців тому
Latest Updates of Dwarka Expressway | Launched Vatika Chowk Underpass | Atanu Dhar | Vlogs
Unveiling the Secrets: Delhi-Dehradun Expressway Phase 1 Package 2 | Atanu Dhar | Vlogs |
Переглядів 1,6 тис.10 місяців тому
Unveiling the Secrets: Delhi-Dehradun Expressway Phase 1 Package 2 | Atanu Dhar | Vlogs |
Updates: Delhi-Dehradun Expressway | ढाई घंटे में पूरा होगा 6 घंटे का सफर | Atanu Dhar | Vlogs
Переглядів 6 тис.10 місяців тому
Updates: Delhi-Dehradun Expressway | ढाई घंटे में पूरा होगा 6 घंटे का सफर | Atanu Dhar | Vlogs
Discover the Vibrant Durga Puja Celebrations in Gurgaon | Atanu Dhar | Vlogs |
Переглядів 2010 місяців тому
Discover the Vibrant Durga Puja Celebrations in Gurgaon | Atanu Dhar | Vlogs |
Exploring the Expressway: Unveiling Hidden Gems | एक्सप्रेसवे का विकास: बेहतर यात्रा के लिए |
Переглядів 61511 місяців тому
Exploring the Expressway: Unveiling Hidden Gems | एक्सप्रेसवे का विकास: बेहतर यात्रा के लिए |
Cloverleaf Magic: Driving Dwarka Expressway| SPR से Dwarka Expressway तक: ड्राइव| Atanu Dhar |
Переглядів 1,2 тис.11 місяців тому
Cloverleaf Magic: Driving Dwarka Expressway| SPR से Dwarka Expressway तक: ड्राइव| Atanu Dhar |
Scenic Drive | Delhi Meerut Expressway | दिल्ली मेरठ एक्सप्रेसवे की खोज यात्रा | Atanu Dhar | Vlogs
Переглядів 504Рік тому
Scenic Drive | Delhi Meerut Expressway | दिल्ली मेरठ एक्सप्रेसवे की खोज यात्रा | Atanu Dhar | Vlogs
Dwarka Expressway's Latest Delhi Update | दिल्ली के विकास की दिशा में द्वारका एक्सप्रेसवे | Vlogs |
Переглядів 3,7 тис.Рік тому
Dwarka Expressway's Latest Delhi Update | दिल्ली के विकास की दिशा में द्वारका एक्सप्रेसवे | Vlogs |
Highway to Happiness: Traveling to Coimbatore | सफ़र का मजा: कोयंबटूर की ओर | Atanu Dhar | Vlogs |
Переглядів 38Рік тому
Highway to Happiness: Traveling to Coimbatore | सफ़र का मजा: कोयंबटूर की ओर | Atanu Dhar | Vlogs |
Dwarka Expressway's Latest Updates | दिल्ली-जयपुर हाइवे पर ट्रैफिक होगा कम | Atanu Dhar | Vlogs |
Переглядів 4,1 тис.Рік тому
Dwarka Expressway's Latest Updates | दिल्ली-जयपुर हाइवे पर ट्रैफिक होगा कम | Atanu Dhar | Vlogs |
Exploring History: Pradhanmantri Sangrhalaya | परिवार के साथ पीएम संग्रहालय यात्रा | Ep 3 | Vlogs
Переглядів 35Рік тому
Exploring History: Pradhanmantri Sangrhalaya | परिवार के साथ पीएम संग्रहालय यात्रा | Ep 3 | Vlogs

КОМЕНТАРІ

  • @pushpenderbhadana35
    @pushpenderbhadana35 19 годин тому

    When delhi part will be ready??

  • @adityaraman3945
    @adityaraman3945 День тому

    Beautiful Expressway. Thanks for showing

  • @parmodseda3877
    @parmodseda3877 21 день тому

    👍

  • @RameshKumar-xp6sr
    @RameshKumar-xp6sr 22 дні тому

    Haryana मे मण्डी डाबावाली से panipat expressway की अपडेट दो

  • @sunildahiya29
    @sunildahiya29 23 дні тому

    Rohtak se bhi isko jodna chaiye...kaloi aur dhamad se hote ek road nikalna chaiye...jis se kaloi aur dhamad ki jameen ache rate per bik sake...hooda power msin aate hi saari jameen saff...😂😂😂😂

  • @NRBsolution
    @NRBsolution 23 дні тому

    Good information Sir

  • @kapilkundu4590
    @kapilkundu4590 24 дні тому

    Sir zero point ki video bnao kmp ke pass se jha se road start ho rha h

    • @atanudhar6226
      @atanudhar6226 24 дні тому

      Zero point ke video Ep1 pe hain sir...

  • @jagdishdarjia9820
    @jagdishdarjia9820 25 днів тому

    कहां तक तैयार हुआ है

  • @ARVINDJAISWAL10
    @ARVINDJAISWAL10 27 днів тому

    Too much zoom.

  • @mehtapramod23
    @mehtapramod23 27 днів тому

    SATELLITE TOLL IS FUTURE TOLL

  • @mehtapramod23
    @mehtapramod23 27 днів тому

    MINIMUM SPEED OF EXPRESS WAY SHOULD BE 150 KM PER HOUR IF WE WANT TO BE SUPER POWER UP TO 2047

  • @mehtapramod23
    @mehtapramod23 27 днів тому

    WE NEED MINIMUM 1 LAKH KM MULTIMODAL MULTILATERAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UP TO 2047

  • @saptak-thesoulofmusic5084
    @saptak-thesoulofmusic5084 29 днів тому

    Good information

  • @nowayout7929
    @nowayout7929 29 днів тому

    Bhut bdiya sir

  • @amitkhatri4632
    @amitkhatri4632 29 днів тому

    Location khahan ki hai

    • @atanudhar6226
      @atanudhar6226 29 днів тому

      Betweenn Hasangarh ( Haryana) and Rukhi Paani village...

  • @skgulia3287
    @skgulia3287 Місяць тому

    Nice update

  • @warishislxlr
    @warishislxlr Місяць тому

    Drone footage please

  • @nirajtrufrost7754
    @nirajtrufrost7754 Місяць тому

    Usefull information thanks 🙏

  • @abhinavsharma1817
    @abhinavsharma1817 Місяць тому

    Sir ye expressway shayad Jammu region ma 6 lane bann rha hai

  • @saptak-thesoulofmusic5084
    @saptak-thesoulofmusic5084 Місяць тому

    Useful updates

  • @nirajtrufrost7754
    @nirajtrufrost7754 Місяць тому

    Good information sir

  • @jayantgiri9968
    @jayantgiri9968 2 місяці тому

    The expressway will be considered complete only when all amenities are made available.

  • @saptak-thesoulofmusic5084
    @saptak-thesoulofmusic5084 2 місяці тому

    Thanks for update

  • @pradeepkumar-ge3iv
    @pradeepkumar-ge3iv 2 місяці тому

    Thanks for one more update on Delhi Dehradun Expressway ❤❤❤

    • @atanudhar6226
      @atanudhar6226 2 місяці тому

      Thanks for your positive response and i will cover more updated videos on DDN XPRESSWAY from EPE to Bhagpat shortly.

  • @pradeepkumar-ge3iv
    @pradeepkumar-ge3iv 2 місяці тому

    Very nice update 👏👏👏

  • @vaibhavbindra4862
    @vaibhavbindra4862 2 місяці тому

    Thanks for a Wonderful update Keep doing Good Work

    • @atanudhar6226
      @atanudhar6226 2 місяці тому

      Thanks for showing your positive response which will motivate to me.

  • @mohsinansari7333
    @mohsinansari7333 2 місяці тому

    Ye to kafi purani video he. Jo apne ab upload ki he

    • @atanudhar6226
      @atanudhar6226 2 місяці тому

      Two weeks ago I have captured the same.....

  • @mohityogamastivlog
    @mohityogamastivlog 2 місяці тому

    Sabse jyada demand wala expressway hai

  • @sajjanmann4815
    @sajjanmann4815 2 місяці тому

    Every xyz starts shooting from home ùpto EPW. WHY NOT COVER UP TO D DOON? Because of your cvonvinience. Boooooooring & irritating

  • @Haryana_aale001
    @Haryana_aale001 2 місяці тому

    15:00 ye underpass nahi hai sahabi nadi ka water passage hai rainy time mai mat gusgana yaha . Pahadi gaon se road se nikalna ya fir 11:00 yaha se right side nikalna 😂

    • @jitu135655h1
      @jitu135655h1 17 днів тому

      Thank you bro for route update

  • @yagayveerarora4252
    @yagayveerarora4252 2 місяці тому

    Bhai ye highway hero Honda underpass se shuru hota h

  • @user-ub8qt3od9m
    @user-ub8qt3od9m 2 місяці тому

    Pataudi hsvp plot 80000/- sq yard, half of new Gurgaon good future

  • @NRBsolution
    @NRBsolution 2 місяці тому

    Good information

  • @srjdhk
    @srjdhk 2 місяці тому

    Thank You ,Sir. Kindly provide new update of Gurgaon Pataudi stretch as soon as possible. Thanks for your efforts😇

  • @md.masudrana3215
    @md.masudrana3215 2 місяці тому

    Wow❤❤

  • @debapriyachatterjee7784
    @debapriyachatterjee7784 2 місяці тому

    Darun . Please make one video from Gurgaon to CR park.

  • @mehtapramod23
    @mehtapramod23 3 місяці тому

    WE NEED MINIMUM 1 LAKH KM MULTIMODAL MULTILATERAL EXPRESS WAY IN NEXT 5 YEAR IF WE WANT TO BE SUPER POWER UP TO 2047

  • @nirajtrufrost7754
    @nirajtrufrost7754 3 місяці тому

    Good information

  • @srjdhk
    @srjdhk 3 місяці тому

    Sector 1 , Pataudi, current rates in range of 70/80k per Gaj. Will be 1.1/1.2 lakh per Gaj after this highway completion before Haryana Election

  • @pawanbahl1103
    @pawanbahl1103 3 місяці тому

    HSVP Sector 1 is the ONE of the best Sector of HSVP Gurgaon ... Considering No Pollution , all Roads at 24 M / 12 M and One of the Biggest HSVP Green Parks in Sector 1 , Pataudi with Lot of Greenery and Close to Pataudi Market , while Communicy Centre work ongoing ans so are commercial Market of Sector 1 under development is Much well placed to best any of HSVP Sector facilities in Gurgaon including Dwarka Expressway being a WELL PLANNED Sector of HSVP Gurgoan ...Price stated above doesnt justify...well connected to KMP...and IMT Manesar ( just 10 km ) and On Gurgaon Pataudi -Rewari (GPR )Expressway

  • @user-ub8qt3od9m
    @user-ub8qt3od9m 3 місяці тому

    Yahan se kmp 5 minute aur Wahan se Pataudi 5/7 minute signal free expressway. Hsvp sector 1 rate 80000/ gaj best location plots on main road

  • @vikramshokeen8807com
    @vikramshokeen8807com 3 місяці тому

    Good viedo

  • @tusharvats9031
    @tusharvats9031 3 місяці тому

    Waiting for new update on pataudi rewari road

    • @atanudhar6226
      @atanudhar6226 3 місяці тому

      It's under process and uploading soon...

  • @pardhan5997
    @pardhan5997 3 місяці тому

    Konsi company work kr rhi h yha?

  • @Being_touristy
    @Being_touristy 3 місяці тому

    What is the status of road starting from Dwarka Expressway

    • @atanudhar6226
      @atanudhar6226 3 місяці тому

      Still it is under construction..

    • @Being_touristy
      @Being_touristy 3 місяці тому

      By when is it expected to be completed Sir? It will be a big boon to sector 88 dwellers

  • @srjdhk
    @srjdhk 4 місяці тому

    Sir, aap road ke video ke saath saath, kuch properties ka b daaliye kisi dealer se baat karke, jaise aap Sector 1 Pataudi pe b video bna sakte hain, kynki gurgaon me sabhi Sectors me rate 1.5L rupe Gaj ho chuka hai, ye highway banne ke baad, Sector 1 pataudi b Sohna ki Tarah ho jaaega

  • @srjdhk
    @srjdhk 4 місяці тому

    Rates in Sector 1 Pataudi??

  • @user-ub8qt3od9m
    @user-ub8qt3od9m 4 місяці тому

    Pataudi hsvp sector plots rate 70-90000 per square yard, sharp rise possible in next 12 months after signal free expressway operational

  • @k.lyadav4021
    @k.lyadav4021 4 місяці тому

    Extremly good. Thanks a lot for your update. However if you can specify starting, end location and distance covered by you in video, it would be better. Keep it up.

  • @tusharvats9031
    @tusharvats9031 4 місяці тому

    Today i visited pataudi really work running in very good direction and very fast..... pataudi rewari highway is become lifeline for Pataudi growth and Development 😊