Time Period of a Project
Вставка
- Опубліковано 17 жов 2024
- In this video, I talk about the time period of a project and the factors to be considered while calculating the same.
Other videos on this channel:
Construction of Roads:
Potholes and its repair: • Potholes and its repair
Concreting of a frame structure:
Survey and Layout: • Construction Survey an...
Excavation for foundations: • Excavation for foundat...
Concreting of Footing and Stub Column: • Concreting of footing ...
Concreting of Plinth Beam: • Concreting of plinth beam
Concreting of Floor column: • Concreting of floor co...
Concreting of RCC Slab: • Concreting of RCC slab
Spalling of concrete: • Cracking and Spalling ...
Repairing spalled concrete: • Repair of Spalled Conc...
Concreting of Overhead water tank and Elevated service reservoir: • Concreting of OHWT and...
Waterproofing:
Terrace Waterproofing: • Terrace waterproofing
Sunken Floor Waterproofing: • Sunken Floor Waterproo...
Box-type Waterproofing: • Box Type Waterproofing
Properties of Concrete:
Curing of Concrete: • Curing of Concrete
Importance of Sand in Concrete: • Importance of Sand in ...
Volumetric Concrete: • Volumetric Concrete
Cracking and Spalling of concrete: • Cracking and Spalling ...
Repair of spalled concrete: • Repair of Spalled Conc...
Flooring:
Stone flooring: • Stone Flooring
Finishing:
Brickwork and Internal Plaster: • Brickwork and Internal...
External Plaster: • External Plaster
Site Safety:
Safety at Construction Site: • Safety at Construction...
Leakages:
Leakages and Seepages from Walls: • Leakages and Seepages ...
Leakages from Windows or Chajja: • Leakages from Windows/...
Leakage Free Expansion Joints: • Leakage Free Expansion...
Sir thats not authentic question that you are defined here .Time period of a project depends upon the nature of the building .nature of the construction methodology
Whats your opion about the dummy activity????
What do you mean by dummy activity
The topic you made is not according to the specification
I have only given an example.
You are right, time will definitely vary as per nature of project