Why we use Gauge Box in Construction Site | How to Use a Measuring Box || By CivilGuruji

Поділитися
Вставка
  • Опубліковано 6 жов 2024
  • #CivilPracticalSiteTraining #CivilGuruji #CivilEngineersTrainingInstitute
    What are the different zones of sand | What are the tests conducted on sand by Civil Guruji
    Like Share & Subscribe
    Book Your Seat, Limited Seat Left
    Registration Open Call :- 9111001234
    Practical Training Detail:- • Practical Site Trainin...
    Register Now and Pay Later:- www.civilguruj...
    Branch Address :-
    1.BHOPAL Civil Guruji :- At Hind convent school Naveen Nagar, Bhopal, Madhya Pradesh 462010
    maps.app.goo.g...
    2.DELHI - NCR Civil Guruji - 25, gate no. 1, behind kailash hospital knowledge park -1 Greater noida (201308) Nearest Metro station : Pari Chowk.
    goo.gl/maps/a2...
    3.LUCKNOW Civil Guruji :- At Prayag public school Sandaulli Umarpur , Juggaur railway station road, Lucknow 225003near goel tower,
    maps.app.goo.g...
    4. NAGPUR Civil Guruji :- Karmaveer Dadasaheb Kannamwar Engineering College KDK College Rd, Opposite Telephone Exchange, Nandanvan, Nagpur, Maharashtra 440009
    maps.app.goo.g...
    In this video Er. Kishan Ojha Corporate Trainer Of Civil Guruji Is Explaining Why we use Gauge Box in Construction Site | How to Use a Measuring Box
    1. A concrete proposal for you:
    2.You mean you don’t know RMC ?
    3.Confirmed concreting ?
    4.Entangled in RCC ?
    Remember :
    To supervise the manpower at site certainly requires skills but if you can do quantity estimation, bills verification etc and also control manpower , your compensation shall rise in steep curve.
    So, please don’t ever skip the calculations part while learning the construction.
    A CEMENT BAG WEIGHS 50 KG AND HAS A VOLUME OF 35 LITRES.
    Volumetric batching of the concrete.
    There are two distinct methods of proportioning the ingredients for concrete :
    1. By the measuring box
    2.By the buckets ( Hindi : Ghamela ,Tagari & Marathi :Pati,)
    Both methods are in actual use at the construction sites where volumetric batching is followed.
    Remember :
    1.The RMC plants , however, do the batching of concrete based on the design mix and hence weigh batching is practiced.
    2.Certain sites also practice the design mix at site and use weigh batching .
    The discussion on S.nos 1 & 2 is excluded from the present post.
    We are talking about only those construction sites which manufacture the concrete at the site
    ( In short : Nominal mix , Mixed at site & cast in situ concrete ) .
    THIS KIND OF CONCRETE WE ARE TALKING IN THIS ARTICLE.
    NOMINAL MIX,
    PROPORTIONED , MIXED & PLACED AT SITE
    THE MEASURING BOX
    [ FARMA ] WHICH MEASURES 12″ X12″ X15 ” OR 1.25 CFT.
    OR 43.75 LITRES
    You must be thinking :Is there is any significance of keeping this size of the measuring box ?
    Right ?
    So first let us see the importance of this size.
    The cement bag has a standard weight of 50 Kg.
    Cement has a bulk density of :1429 Kg/CuM.
    Hence the volume of 1 bag of cement shall be
    = 50/1429 =0.03499 CuM.
    Since 1 CuM = 1000 Litres
    therefore, the volume of 1 bag of cement shall be 0.03499 CuM.X 1000 Litres = 34.99 Litre.
    For practical purposes, we can consider this volume to be 35 Litre.
    How do we use the measuring box for batching different grades of concrete ?
    1.Let us say we want to mix a concrete of grade M20 .
    We know that the Nominal mix for M20 grade is : 1 :1.5 :3
    since we are doing volumetric mix, this means that :
    If we take
    1 part of cement by volume,
    we shall have to take 1.5 parts of sand measured in the same units and
    3 parts of aggregate again measured in the same units .
    So now , the same proportion 1 :1.5 :3 can also be written as :
    1x 35 Litres : 1.5 x 35 Litres :3 x 35 Litres
    or this can be further converted into :
    1 bag of cement : 1.5 measuring boxes of sand : 3 measuring boxes of coarse aggregate.
    Assuming that we have to maintain a water cement ration of 0.5 ,
    we shall need 0.5 x 50 kg = 25 Kg or 25 Litres of water for one batch of concrete.
    Now the steps are quite clear . Right ?
    We start rotating the drum , pour about 10 Litres of water into the drum ,
    Place 3 measuring boxes of coarse aggregate in the mixer drum ,
    Followed by 1.5 measuring boxes of sand ,
    Add remaining water , and then finally place 1 bag of cement in the drum .
    One batch of concrete is ready to pour after rotating drum for about 1 to 3 minutes.
    This concrete can now be transported to the actual location either through trolleys or hoist and trolleys.

КОМЕНТАРІ • 12

  • @SarveshKumar-hb7lb
    @SarveshKumar-hb7lb 3 роки тому +1

    Good teaching sir,
    Civil guruji is the best training institute.

    • @Civil_Guruji
      @Civil_Guruji  3 роки тому +1

      Thank you so much Sarvesh..... Keep Learning 😊

  • @ammiamit4028
    @ammiamit4028 3 роки тому +1

    Fantastic teaching sir

    • @Civil_Guruji
      @Civil_Guruji  3 роки тому +1

      Thank You Amit.... Keep Learning.. Keep Growing

  • @AfrozCivil
    @AfrozCivil 3 роки тому +1

    Very Needful information...👍👍👍
    #Afroz_Civil

    • @Civil_Guruji
      @Civil_Guruji  3 роки тому +2

      Thank you Afroz... Keep Learning.... Keep Supporting

  • @a.k2636
    @a.k2636 Рік тому +1

    💓

  • @aditlapcha
    @aditlapcha 3 роки тому +1

    hostel available he kya for Loading & fooding and what is 60 fees after placement

    • @Civil_Guruji
      @Civil_Guruji  3 роки тому +1

      Adit lodging and food sare facilities available hai and fees ki details ke liye call kare 9111001234 par

    • @Civil_Guruji
      @Civil_Guruji  3 роки тому

      60% fees has to pay after your placement.

    • @mdtanveer659
      @mdtanveer659 3 роки тому

      @@Civil_Guruji 100 % h kyaaa

  • @faisalqureshi9287
    @faisalqureshi9287 2 роки тому

    ⭐⭐⭐⭐⭐