ARE Live: Project Management Mock Exam - 2018

Поділитися
Вставка
  • Опубліковано 17 лис 2024

КОМЕНТАРІ • 7

  • @CHFArchitect
    @CHFArchitect 5 років тому +29

    Your answer to Question 6 is incorrect per the B101. The B101 calls for a cost estimate at the end of SD, updating it at the end of DD, and updating it at the end of CD. See AIA B101 3.4.4.

    • @VannHerrenDesigns
      @VannHerrenDesigns 5 років тому +3

      Thank You for pointing this out

    • @robblos9358
      @robblos9358 5 років тому +3

      Correct! That threw me at first when I saw this.

    • @Adrian-ko6kg
      @Adrian-ko6kg 4 роки тому +2

      I thought the same. It makes sense what his thoughts are, but this is about answering per AIA contracts and we are to perform a cost estimate at end of each phase.

    • @miggity6666
      @miggity6666 2 роки тому +1

      True; answer A is correct per any test that NCARB would give.

  • @clemsmith2253
    @clemsmith2253 4 роки тому +5

    I dont think you brace one of the most important elements of the exam in your studies; speed. you have 4 minutes to use deductive reasoning to find an answer. its sorta helpful you talk so much, but ultimately you're loosing us because we all want to practice fast deduction. why not try both. deduct the right answer in two to three minites, and THEN explain

    • @Blackspectacles
      @Blackspectacles  4 роки тому

      Thank you for your feedback! Our ARE Live episodes are designed to dig into each of the sample questions in the mock exam and break down the reasons why the answers are correct or incorrect. Our subscription products are designed to emulate the real exams.