  • Gas Pipeline Construction Project - Pipeline Lowering-in at River Crossing with Liebherr Side Booms (Pipe Layers). Sheet Piling done to avoid collapse of river banks.

КОМЕНТАРІ • 25

  • @freekingawwsome
    @freekingawwsome 3 роки тому +2

    Now that was so perfect. Very nicely produced.thank you for the share

  • @williamschlenger1518
    @williamschlenger1518 3 роки тому +1

    I wish we had equipment like that back in the 1960s.We ran 16 inch gas lines with one 944cat loader with a sideboom.

  • @garysoutar451
    @garysoutar451 27 днів тому

    Worked on the St Fergus too Mossmorran pipeline 1980s
    am sure the used floating barges to cross the Tay and Earn rivers in Scotland because there was no way you were blocking any Salmon rivers.
    I never seen that cause I was forth ahead .

  • @joemakowichuk3888
    @joemakowichuk3888 Рік тому

    What was that like who’s welding that tie in

  • @mustafaemir636
    @mustafaemir636 2 роки тому

    Tüm emeği geçen herkesin eklerine sağlık orda çok güzel bir çalışma oldu

  • @johnnyhunter4345
    @johnnyhunter4345 11 місяців тому

    We used concrete collars bolted on pipe to keep in trench in river

  • @bikepamoretowork1459
    @bikepamoretowork1459 3 роки тому

    nice..

  • @朱拜勒轻骑兵
    @朱拜勒轻骑兵 4 роки тому

    What's the next? How to remove the belt? How to do the welding for the remaining?

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  3 роки тому +1

      First detach the belt from the hook of pipe layer. Then pull the belt to one side. Since the soil below the pipe is loose, no issues when removing the belt. After dewatering, welding of the next pipe section can continue.

  • @shawnmoore6597
    @shawnmoore6597 3 роки тому

    And the floaties on top were needed for what?

    • @liamclarke5851
      @liamclarke5851 2 роки тому

      to fill with concrete so it does'nt float

  • @JoseMaciasraudales
    @JoseMaciasraudales 8 місяців тому

    Natrai trabajo de operador

  • @SenorAhole
    @SenorAhole 3 роки тому

    Nice!

  • @ОромжонНоркулов
    @ОромжонНоркулов 9 місяців тому

    ok

  • @imadayache3935
    @imadayache3935 2 роки тому

    سايدبوم

  • @SenorAhole
    @SenorAhole 3 роки тому

    German style

  • @bobcreamier9854
    @bobcreamier9854 3 роки тому

    How to fuck a river up

    • @utubedigitalmedia4590
      @utubedigitalmedia4590  3 роки тому +1

      River will be re-instated to the original condition after the pipeline laying work is completed.

    • @FirstGendodgegarage
      @FirstGendodgegarage 2 роки тому

      grow a pair ding dong they fix it after