1.08 Koyembedu Market Station 3.25 Natesan Nagar Station Around 5.50 Virugambakkam Station 6.47 Kaliamman Koil on left. New road being formed opposite side for alignment to Arcot road. New road being formed after court case to protect Kaliamman koil and Sundarvardharaja Perumal koil. Kaliamman koil will divide into two one ways at this point
@@NambiValavan no station at that location. Virugambakkam station was called Ilango nagar at it is located around 5.50 at Ilango nagar. Since residents petitioned name change as Virugambakkam is more popular name was changed.
This is a chance because after porur stretch planning to open next year all the working labour will work in these routes. Most of the main base laying work is done in some places,so atleast by end of 2027 it will surely be over.
🎉🎉 Super Update 🎉🎉
Thanks
Good update bro
Thanks
Nice...
Vadapalani Orange line station Island Platform?
Viaduct has gap like Poonamallee to Porur stretch....
Thanks. May be
Yes island platform
Good update. Kindly improve video quality.
Sure. Will try
1.08 Koyembedu Market Station
3.25 Natesan Nagar Station
Around 5.50 Virugambakkam Station
6.47 Kaliamman Koil on left. New road being formed opposite side for alignment to Arcot road. New road being formed after court case to protect Kaliamman koil and Sundarvardharaja Perumal koil. Kaliamman koil will divide into two one ways at this point
I think 6.48 to 6.50 might be Virugambakkam station. But not sure
@@NambiValavan no station at that location. Virugambakkam station was called Ilango nagar at it is located around 5.50 at Ilango nagar. Since residents petitioned name change as Virugambakkam is more popular name was changed.
@@NambiValavan also the pillar spots around Ilango nagar marked as STP meaning Station Pillar
@@gouthaman.gopalan Good information
Super Coverage of Metro. But please cover the Beach - Egmore 4th line Current Progress. Thanks 😊.
Thanks. Will try
Ithuka kathutu irunthen
no way this stretch is going to open before 2027
This is a chance because after porur stretch planning to open next year all the working labour will work in these routes. Most of the main base laying work is done in some places,so atleast by end of 2027 it will surely be over.