According to IS 2502, Table IX, Point C, another formula may be = N*3.14*D+8d=20*3.14*812+8*8=51057.6 mm= 51.06 m Where D= Dia of helical stirrups along CENTRR LINE d= dia of bar
sir esmey dia nikaltey bkt -d/2 qu nhi qia..i.e 900-2*clear cover-d/2 ...a jo ki rectangular strippers m jo ki hm kia they sir iam from nepal plz clear me my dought
Sir aap ne rectangular aur circular me stirrup ka dia nikalne ke liye[900-2×clear cover - 2× half dia ] kiya tha lekin helical stirrups me dia nikalne ke liye aap ne [900-2×clear cover ] kiya tha aisa kyu? Please reply sir 🙏🙏🙏🙏🙏
1st and 2nd vedio Mai bi clear cover use Hua but galti se ouno ne consider Kiya Hai ki effective cover In effective cover we consider 2 time of half Dia I think this
Dia of bar missing ? muje dia of bar janna he is particular video me apne dia of bar kya tha, muje ye pta h kis dia of bar ka koi kam nhi h, but mje janna he ki ap jis calculation ki length 51.64m aai h vo kis dai of bar ki aai h.
Pilling mein konsi MM bar used karna chahiye 12mm or 16mm for 3 storey Building G+2 house, Agar 12mm used kare toh kitne number of Bars used kare aur agar 16mm used kare toh kitne number of bars used kare please reply.. sir ji
Sir..... muje aaj interview me Rate ke bareme saval kiya tha Lekin muje Construction Rate ke bare me koi Nolejd Nahi he Plz sir Construction work ka Materials with Lebor rate ko Foot or Meter me Kar ke Ek video banana plz sir Total Rate for civil. Work
According to IS 2502, Table IX, Point C, another formula may be = N*3.14*D+8d=20*3.14*812+8*8=51057.6 mm= 51.06 m
Where D= Dia of helical stirrups along CENTRR LINE
d= dia of bar
What is 8d
Super
Bahut achcha sa
Bar ka Dia. Minus Q nhi kiya rectangle n circle me kiya tha waisa
sir esmey dia nikaltey bkt -d/2 qu nhi qia..i.e 900-2*clear cover-d/2 ...a jo ki rectangular strippers m jo ki hm kia they sir iam from nepal plz clear me my dought
Excellent video sir. thnx a lot.
thanks
Sir aap ne rectangular aur circular me stirrup ka dia nikalne ke liye[900-2×clear cover - 2× half dia ] kiya tha lekin helical stirrups me dia nikalne ke liye aap ne [900-2×clear cover ] kiya tha aisa kyu?
Please reply sir 🙏🙏🙏🙏🙏
√2574.8²+200² sir iska rootober karne per answer jo h 2582.556912 h aur aapne to 2581.85 btaye to sir indono me minor difference na
No lap length added,circumference is start to end length but spiral steel to end 200 mm differ circumference se thoda length bedega
sir dia of stirrups nikalne main half thickness kyu ne li
1st and 2nd vedio Mai bi clear cover use Hua but galti se ouno ne consider Kiya Hai ki effective cover
In effective cover we consider 2 time of half Dia
I think this
Dia of bar missing ? muje dia of bar janna he is particular video me apne dia of bar kya tha, muje ye pta h kis dia of bar ka koi kam nhi h, but mje janna he ki ap jis calculation ki length 51.64m aai h vo kis dai of bar ki aai h.
Sir how to calculate the spacing of stirrups????
Pilling mein konsi MM bar used karna chahiye 12mm or 16mm for 3 storey Building G+2 house,
Agar 12mm used kare toh kitne number of Bars used kare aur agar 16mm used kare toh kitne number of bars used kare please reply.. sir ji
ap reply nahi dete hoh sir ji
Good Job sir
thank you Sohil Ji
Very Good
Thanks
Pile column ki cap 3 floor KE liye kitni rakhna chahiye
I think you should find the cutting length of Helix bar 51.63 Mtr in market.
Sir ,exposer of concrte casting pr video banao
ok
Sir meri site pe r ABHI pile foundation hi chal Raha he
pile me kis tarah ka stirrups use kar rahe hai, circular ya helical?
Postion Ring circular he or pile ki puri Ring HELICAL HE
Pile ke bich bich me position Ring ciruler kari he
Or 3000 - 600 = 2400 pe baulb kiya he
@@maleksohil3521 ok
Sir,Lapping length bhi plus krna hoga na
han, lapping length ko v plus karna hoga,
total kitna length lena padega wo mai bataya hu
Ryttt
Sir helical Stirrup's mein kam nhi hota hai because pitch maintain karne mein problem hota hai..
ji han,
Bbs of pier cap/ shaft cap ka video nhi hai 1 v
Han Vijay Ji,
iss topic pe video nahi hai
lekin bahut jald hi video banaunga
thanks for watching my videos...
Sir..... muje aaj interview me Rate ke bareme saval kiya tha
Lekin muje Construction Rate ke bare me koi Nolejd Nahi he
Plz sir Construction work ka
Materials with Lebor rate ko
Foot or Meter me Kar ke Ek video banana plz sir
Total Rate for civil. Work
ok Sohil Ji, mai material aur labour rate ke upar video bana kar upload karta hu.....
Thanks sir
Aapne 2 se multiply kyu ki clear cover me
No of turn me + 1 nhi kiya qunn
21 turn ana chahiye
Sir please share excel sheet with formula
Dia of stirrupa nikalne me apne clear cover to lia but apne half of dia ni lia jo apne circular m ki tha or C=pie D Ku lia
Last jo calculation samjha nahi
Sorry Bhai aapko yahi nhi malum hai ki pile me cover kitna diya Jaata hai
ohh
Clear cover ko 2*40 q kiya
kyoki reinforcement aur concrete face ke bich 40mm ka space rahta hai
All around 40mm,why 40*2
@@shishram2469 because I take the diameter, so 40*2
Ok sir
Spiral or helical same h ya alag h
22 turns