How is your progress going? When I did my swap, was so much easier to do it with the body off.. also removed all the auto trans cooler piping.. There are alot of nickle and dime stuff you should consider while you have all that access to engine...
The project is going well I thought I would have a lot more free time but that’s not the case. I hope to have all the drive line all done by February. Than I can start working on the cab Thanks
@@JeepDaveT Right on!!, doing a project like this is time consuming, but, will be worth it in the end... I had the same done with my truck, but had to farm it out... I was able to work in with the guys doing it, so I can say I did about 40% of the work!!
How is your progress going? When I did my swap, was so much easier to do it with the body off.. also removed all the auto trans cooler piping.. There are alot of nickle and dime stuff you should consider while you have all that access to engine...
The project is going well I thought I would have a lot more free time but that’s not the case. I hope to have all the drive line all done by February. Than I can start working on the cab
Thanks
@@JeepDaveT Right on!!, doing a project like this is time consuming, but, will be worth it in the end... I had the same done with my truck, but had to farm it out... I was able to work in with the guys doing it, so I can say I did about 40% of the work!!