INITIAL SETTING TIME OF CEMENT

Поділитися
Вставка
  • Опубліковано 2 гру 2024

КОМЕНТАРІ • 32

  • @rameshgadidesi4625
    @rameshgadidesi4625 3 роки тому

    Finally you not showing initial setting time value . actually initial setting time before 30 min naa.

  • @sanjeeviglesias6293
    @sanjeeviglesias6293 5 років тому +2

    The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc

  • @JohnPeter-cf9rv
    @JohnPeter-cf9rv 3 місяці тому

    தமிழ் வாழ்க வளமுடன்

  • @rajaram-pu2tn
    @rajaram-pu2tn 3 роки тому +2

    Don't give half half information 1)when ur add water timer should starts 2) for make penidation should need 2differnt diameter needle 3)use for determine initial setting time for 3mm needle 4)use for final setting time smaller mean 1mm 5)waterquantity=0.85×standard consists ofwater(like 0.32)×weight of cement (may you take 250 gram)

  • @thirunavukarasu0079
    @thirunavukarasu0079 2 роки тому +2

    👌

  • @mandanmishra5660
    @mandanmishra5660 4 роки тому +2

    No better performance by you, 1)you don't obey the gauging rule. 2)you don't obey the time period. 3)I don't understand how you use gauging trowel by one hand. 4)pouring water is too slow.

  • @samarthanreddy4117
    @samarthanreddy4117 5 років тому +2

    0.85×32% equals 0.272 sir.. how did u get 68ml? Could u please explain that

    • @yasamnaresh5634
      @yasamnaresh5634 5 років тому +5

      In serial no 3 the percentage of water taken is 32% i.e 80ml..at 32%we obtained standard consistency.so for IST we have to take 0.85*80=68ml..

    • @rohitgooner878
      @rohitgooner878 5 років тому +1

      The Weight of cement taken in this case is 250g.
      So, 32% of 250 = 80ml
      0.85 * 80 = 68ml

    • @ashwinichinu2681
      @ashwinichinu2681 5 років тому +1

      Tq u sir

    • @janninoenecio78
      @janninoenecio78 3 роки тому

      @@rohitgooner878 where did 0.85 came from?

    • @shantharam2699
      @shantharam2699 Рік тому

      Actually just 24% water is enough of cement weight bro

  • @mdshahbaz8054
    @mdshahbaz8054 5 років тому +1

    Thank you sir.

  • @cockerala1633
    @cockerala1633 5 років тому +1

    Thank you sir

  • @SoudagerAamer
    @SoudagerAamer 5 років тому +1

    0:22 That's needle isn't it?

  • @Right_ToServe
    @Right_ToServe 4 роки тому

    Sir I think u r added again some of water... 🤔🤔

  • @civilengineeringbykrishans9406
    @civilengineeringbykrishans9406 4 роки тому +1

    Good video

  • @KShireesha-uj2dx
    @KShireesha-uj2dx 26 днів тому

    250/100 *32=80
    0.85*80=68

  • @ravipatel9316
    @ravipatel9316 5 років тому +1

    But, lastly you not showing what is exect initial setting time...

    • @mgmwgl
      @mgmwgl 5 років тому

      @Ravi Patel.. its 35 minutes

    • @vishnuvardhan7135
      @vishnuvardhan7135 5 років тому

      @@mgmwgl but our Is standard initial setting time of cement is 30.
      But , experimentaly you get 35.
      Could you please tell us sir

  • @bhagatuttam1452
    @bhagatuttam1452 4 роки тому

    Good knowledge sir ,

  • @omkarutekar8950
    @omkarutekar8950 5 років тому +1

    take 400 gm of cement hame to aisa bata yaa hai

  • @uwiringiymanajohn2352
    @uwiringiymanajohn2352 3 роки тому

    E

  • @badalkumar6603
    @badalkumar6603 4 роки тому +1

    Galat testing kiya hai.

  • @gautamkadam4067
    @gautamkadam4067 5 років тому +1

    सब गलत कर रहे हो.

    • @sanjeeviglesias6293
      @sanjeeviglesias6293 5 років тому

      The cement weighing 300g is taken and it is mixed with Percentage of water as determined in consistency test. The cement paste is filled in the vicat mould. The square needle of cross section 1mm× 1mm is attached to the moving rod of the vicat apparatus. The needle is quickly released and it allowed to penetrate the cement paste in tge begging the needle penetrate completely.it is then taken out and dropped at a fresh place the procedure is repeated at regular intervals till the needle does not penetrate completely the needle should penetrate upto about 5 mm measured from bottom. The initial settings time is the interval between the addition of water to cement and the stage when needle cease to penetrate completely.thia time should be about 30 minutes for opc

  • @arunkumar2929
    @arunkumar2929 3 роки тому

    👎👎👎👎

  • @thetechnicalaspirants357
    @thetechnicalaspirants357 4 роки тому

    Thank u sir

  • @gopalakrishnapodilapu7599
    @gopalakrishnapodilapu7599 3 роки тому +1

    Thank you sir