Thanks mate. I'm a QS student in UK and this is good for memory.
Wish you had more videos these are the best I can find on UA-cam.
Why isn't there the use of center line method for excavating topsoil ?
Continue up to the end your doing a good job
hi tanks, it was helpfull.can you upload from excavations to brickwork in trenches please
Hi Isaac a civil engineering student from Ugandan. May you help me on how to takeoff both internal and external trenches off a building plan.
my guy we need more videos from you
Nyiko Malwandla explain why you use add 2/1.00i mean is 1 meter constant or you can use any please please answer
Nice🤝
Pls how can do abstract schedule and specification for plans
Thanks ,it's really helpful.
Just wondering if you could help me with something
pleaese please explain why you use add 2/1.00i mean is 1 meter constant or you can use any please please answer
Is the clearance at both sides
it is the allowance for the working space, 1 meter each side so both sides its 1 times 2. it is a provision in SMM
my guy can you do the mean girth of a plan with a verander
We did this one in our lecture class 2016 CPUT
If you are able to reply back I need help in my study?
Videos please
Thanks mate. I'm a QS student in UK and this is good for memory.
Wish you had more videos these are the best I can find on UA-cam.
Why isn't there the use of center line method for excavating topsoil ?
Continue up to the end your doing a good job
hi tanks, it was helpfull.can you upload from excavations to brickwork in trenches please
Hi Isaac a civil engineering student from Ugandan. May you help me on how to takeoff both internal and external trenches off a building plan.
my guy we need more videos from you
Nyiko Malwandla explain why you use add 2/1.00
i mean is 1 meter constant
or you can use any
please please answer
Nice🤝
Pls how can do abstract schedule and specification for plans
Thanks ,it's really helpful.
Just wondering if you could help me with something
pleaese please explain why you use add 2/1.00
i mean is 1 meter constant
or you can use any
please please answer
Is the clearance at both sides
it is the allowance for the working space, 1 meter each side so both sides its 1 times 2. it is a provision in SMM
my guy can you do the mean girth of a plan with a verander
We did this one in our lecture class 2016 CPUT
If you are able to reply back I need help in my study?
Videos please