Take a virtual tour of the Sydney Metro Western Sydney Airport station site with CPB Contractors

Поділитися
Вставка
  • Опубліковано 16 лис 2024

КОМЕНТАРІ • 15

  • @DidSome
    @DidSome 3 місяці тому

    i admire your skill in blending entertainment with education!

  • @steveamurray59
    @steveamurray59 5 місяців тому +2

    Why were the tunnel Segments brought by truck from Brisbane and not built in Sydney ? Seems that was a expense that could have been avoided and why wasn't rail considered to transport these segments.

  • @artistjoh
    @artistjoh 7 місяців тому +3

    It doesn't seem very environmentally friendly to be making concrete tunnel segments in Brisbane, then sending them by truck to Sydney. Oh, the irony of not using rail for transportation.

  • @jetpackadventures1202
    @jetpackadventures1202 10 місяців тому +2

    youneed the guy from b1m channel to do a thing rework on this and it woul be 100%

  • @davidbraithwaite704
    @davidbraithwaite704 10 місяців тому

    Where does the spoil go? I think people would like to know 🤔

    • @daveg2104
      @daveg2104 8 місяців тому +1

      "Tunnel excavated materials have been identified for sustainable reuse as part of future construction at Western Sydney International Airport". Some of it has probably been used to level/landscape areas of the current airport construction, and the rest is being stored onsite, for later use on the expansion of the airport. You could get in touch with them and ask. This isn't "top secret" information.

  • @huanengneng
    @huanengneng 9 місяців тому +2

    loads of international student worker

  • @JJ-mc8lu
    @JJ-mc8lu Місяць тому

    Unfortunately this line goes north instead of East.

  • @misteri_87
    @misteri_87 10 місяців тому

    How can I join? I got a call but Visa told me to pay it myself. Is that true?

    • @Nāmarūpa1
      @Nāmarūpa1 3 місяці тому

      What are you talking about?

  • @Nāmarūpa1
    @Nāmarūpa1 3 місяці тому

    Sorry, but that was a very dull documentary. Not a single shot of a TBM. There are a thousand examples on YT of how to showcase big engineering projects.

  • @PeterCowan1969YouTubePersonal
    @PeterCowan1969YouTubePersonal 4 місяці тому

    No where near as good as the high capacity double deck Sydney Trains & these single deck ugly privatised Metro's only have 3 carriages & not even compatible with other Metro they built in Sydney. WHAT A BACKWARD STEP & WHAT A JOKE. Should have been built as 8 car double deck Sydney Trains.

  • @Puppydoug
    @Puppydoug 9 місяців тому

    I'm sure it will be lovely. But it's still Western Sydney and it'll still be a shi*thole.