Joint sealing of nora® floorings - norament

Поділитися
Вставка
  • Опубліковано 3 жов 2023
  • In general, the joints of nora® floor coverings do not have to be sealed on the entire surface.
    However, joint sealing is recommended with moisture sensitive subfloors and in rooms which are subject to intensive wet cleaning
    (e. g. hygienic areas/operating theatres in hospitals and laboratories).
    Joint sealing is mandatory for:
    • nora® floor coverings with a foam backing (noraplan® acoustic)
    • noraplan® ed floor coverings using nora® 1-component cold weld
    • joints between floor covering and skirting S 3003 using nora® 1-component cold weld
    Execution 24 hours after installation at the earliest.
    (Exception: installations with nora nTx and nora dry adhesives)
    If joints have to be sealed longitudinally as well as transversely 12 hours have to pass between the two work steps.
    Joint sealing is not equivalent to a mandatory sealing according to any country specific standard.
    We recommend nora® 1-component cold weld for the sealing of joints between nora® floor coverings and rising elements like masonry, door frames etc.
    #Joint sealing, #nora, #norament, #rubber flooring, #floor covering, #laying, #floor laying, #grout

КОМЕНТАРІ •