Jaideep, I always follow you for latest updates on all the Infrastructure Project, You are star providing realtime updates on all the Infrastructure Projects.....
Very nice video. Nicely explained n summarised at the end. I appreciate small n short videos . Keep going this way. We are eagerly awaiting world class metro connectivity. Keep updating working community about the progress
आपके व्हिडीओ सही और सच्ची जाणकारी देणेकेलीये जाने जाते है देश मे ऐसे कामो केलीये जगह कम पडती है बढती आबादी देखते हुए हर शहर मे ऐसे काम केलीये जमीन रिजर्व रखनी चाहिये
seriously..im damn sure it would take another 5 years to complete ..because the CM s son whos the lok sabha corporator thrice is least worried be whatever infrastructure the city requires , the roads, traffic lights , SATIS , the so dream project of direct train from kalyan to vashi ..which requires a viaduct reroute at kalwa expected with a budget of 450 crs then five years ago ..will definitely cost now 2000 crs ....best example of a sitting duck ever 😂😂😂😂😂😂
Yaha underground aur elevated ka pata nahi hai bhiwandi me oppose ho raha hai ab bol rahe hai hum underground leke jayenge Phir se design change hoga aaram se 5-8 saal aur lagega 😂
Bro Kalyan crossed Thane in GDP Thane is 48 Billion Kalyan is 52 Billion Both the cities are proud for Mumbai as 100 billion is owned by this 2 cities in Mumbai 400 Billion GDP
More requirement in present condition is Mulund check naka to kasarvadvali ie line 4 argumentation....which should be done on priority by new Maharashtra govt / CM
worst plan made , thane railway station is not connected or even near to kapurbawdi , so you have to take a cab or rickshaw from kapurbawdi metro station to thane railway station, that even waste time and also increases the fare, line 5 should extend till thane railway station otherwise that doesnt make sense and will be inconvinient
Not there is a option of buses from balkum Station you can take bus from balkum which connects thane Station. And no need to change from kapurbawdi its for commuters who work over ghodbandar and Mulund sides not for thane Station crowdAnd thane Station is located in so crowded area that metro can't reach their
This metro is not designed for thane Station commuters crowd their is many options from balkum Station till thane Station buses is available from balkum.
No one going to use metro for going thane Station 😂 there is many options of buses from bhiwandi to thane. Or balkum Station which is 2nd metro station of line 5
You are showing totally wrong maps of Metro lines at 2.31 line 2b and line 7 are till Dahisar. Please see at what location does Dahisar come in actual map. You need to study maps of mumbai before making such videos. I am damn sure you do not stay in Mumbai.
Kalyan is the WORST PLACE in MUMBAI , Not at all commutable by Road, Train and water ways Bhivandi People could connect to thane before Kalyan People Bhiwadi has 80 percent commercial area Kalyan is 80 percent residential area Only God can check on what basis they are planning I wish I could get shifted Pune or Nashik or Ahmedabad or else 😢😢😢 Mumbai is the PLACE where people trade their precious LIFE for some extra money
First time kisi ne itna simple tarike se Mumbai metro ko explain Kiya tha. Thank you sir
Very informative content. Pls
Make regular vlogs on these kida infra developments in Mumbai, Pune and Nagpur
thank you so much dude much needed update , keep updating on this
Jaideep, I always follow you for latest updates on all the Infrastructure Project, You are star providing realtime updates on all the Infrastructure Projects.....
Very nice video. Nicely explained n summarised at the end. I appreciate small n short videos . Keep going this way. We are eagerly awaiting world class metro connectivity. Keep updating working community about the progress
Looks like 2 more years.
खूप छान video
आपके व्हिडीओ सही और सच्ची जाणकारी देणेकेलीये जाने जाते है देश मे ऐसे कामो केलीये जगह कम पडती है बढती आबादी देखते हुए हर शहर मे ऐसे काम केलीये जमीन रिजर्व रखनी चाहिये
Please make video on widening of Mumbai nashik highway from thane to wadape😢😢😢😢😢😢😢😢
+1
Forever in progress
Appriciate ur work. Keep it up.
Going very slow. Not expected from NDA government. Shame on you Mhayuti Government. Learn from Delhi metro.
seriously..im damn sure it would take another 5 years to complete ..because the CM s son whos the lok sabha corporator thrice is least worried be whatever infrastructure the city requires , the roads, traffic lights , SATIS , the so dream project of direct train from kalyan to vashi ..which requires a viaduct reroute at kalwa expected with a budget of 450 crs then five years ago ..will definitely cost now 2000 crs ....best example of a sitting duck ever 😂😂😂😂😂😂
Bich MVA aa gayi nahi to Kab ka ban jata.
Good one Jaydeep... 🥳👌🏻👌🏻💐
Well explained video jaideep bhai ....nice work .....keep updating us ....Thank you
Yaha underground aur elevated ka pata nahi hai bhiwandi me oppose ho raha hai ab bol rahe hai hum underground leke jayenge Phir se design change hoga aaram se 5-8 saal aur lagega 😂
2027 kya 2037 tak bhi nahi hoga ... Sarcasm but may come true..
Very nice video sir
mumbai city unplanned city whole of world
True 😂
Most of the cities in India are unplanned 😢
Because of congress
Biggest unplanned city
thoda history bhi padh liya karo. As to why it is like this.
please cover Line 2b with manadale depo and parked rakes visible even on Satellight maps.
2:38 it is Line 2A not 2B
Good information
Seems work done very fast of building deck & pillars. Even track laying. Only OHE polls, wires & finishing of station 🚉 is remaining
Sir Nice information 😊
Good job jaydeep. Just show on single slide what's operational & under construction
Much much needed in Mumbai and surrounding areas
Very nice ❤❤
7:02 Purna station is Apurna.
I know it's a lame joke but still.
Please Also make a video on Mumbai metro line 4&4a
Bhiwandi Kalyan will take another 5 yrs....it's still in planning stage
thanks to the sleeping corporator of the city 😂
Mumbai me metro ka kaam bahut jyada slow h ,,sarkar in sab pe dhyan q nhi deta 😢😢😢
Reason is already existing traffic, thin roads, pollution limits slowing construction rates and other construction projects around area
@prathameshozarkar yes but how much time to complete a metro project? 10-12yrs ???
@prathameshozarkar lack of vision and our citizen also responsible who don't give their land in time to government body
@@Yugkumar23 Yes that's another point I forgot, true
phase 2 lavar kam chalu kryala hv
thane bhiwandi peksha
kalyan to bhiwandi traveller jast astil
Bro Kalyan crossed Thane in GDP
Thane is 48 Billion
Kalyan is 52 Billion
Both the cities are proud
for Mumbai as 100 billion is
owned by this 2 cities in
Mumbai 400 Billion GDP
Source ?
Why is the Kalyan side's work on hold? Is there any reason?
I notice pillers under construction near/next to Kalyan Station.
Ap sabhi metro line ki update dekha rahe ho na all remaining lines like detox traveler vo delhi ke project ki bahut acche se update dete hai
महोदय मार्च 2026 तक हो जाना चाहिए जिस हिसाब से काम चल रहा हैं
please do metro line 9
Which railway station is nearby from kasheli metro station
More requirement in present condition is Mulund check naka to kasarvadvali ie line 4 argumentation....which should be done on priority by new Maharashtra govt / CM
Bhai, Mumbai Metro Line 2b DN Nagar to Mankhurd Mandale ke progres par video banaye?
Can u update video on Navi mumbai metro Line 2 and 3
good video
Jaideep ji metro line 4 chya progress var pan video banava please
You have not mentioned Navi Mumbai metro that is operational
Kab tak chalegi metro
Please upload Thane to Borivali underground tunnel new route update as I said previous also in different video
Phase 1 hi start kr do dhire dhire bnate rho 2030 tak
Please make a video on L4 also.
मेहनतीला salam
Droneman video ghetla ahe ka
Opening Date? ??
Please make a video metro line 13 Mira road to virar
Metro line 13 pe bhe video banao
Please video on Goregaon Mulund link road
How 60-70% complete? Work has not even started on Bhiwandi - Kalyan route. It's just 30-40% work till now
I am talking about phase 1
This video is on phase 1
Itni khudai ho chuki mumbai ki,na kahin masjid nikli na mandir
Line 4, 6 please
नई सरकार आई है शायद तेजी पकड़े तो 2027 में पूर्ण कार्य हो
2030 पर्यंत शक्य नाही 😢
Metro 12 kabhi update Dena Bhai isi tara
Aramse 2030 Tak kechenge, or else 2047 ko ummeed kar sakte hai
Metro line 4 ka update daalo
मेट्रो प्रोजेक्ट को जल्दी से पूरा करना हो तो गडकरी जी के हाथ में दे दो।
slums are seen everywhere
Bhayandar virar metro ka kam kabhi suroor hoga
worst plan made , thane railway station is not connected or even near to kapurbawdi , so you have to take a cab or rickshaw from kapurbawdi metro station to thane railway station, that even waste time and also increases the fare, line 5 should extend till thane railway station otherwise that doesnt make sense and will be inconvinient
Agreed
Not there is a option of buses from balkum Station you can take bus from balkum which connects thane Station. And no need to change from kapurbawdi its for commuters who work over ghodbandar and Mulund sides not for thane Station crowdAnd thane Station is located in so crowded area that metro can't reach their
This metro is not designed for thane Station commuters crowd their is many options from balkum Station till thane Station buses is available from balkum.
No one going to use metro for going thane Station 😂 there is many options of buses from bhiwandi to thane. Or balkum Station which is 2nd metro station of line 5
बुलेट ट्रेन अपडेट द्या
Work is very slow
Phase 2 bante bante aur 10 saal lagega
Phase 2 hoga nahi land aquisition problem
Superb.... March 2026 mai pura hoga.
Ek WDFC video bano... From Virar to Panvel
Thank you😀
Already made sir
Please watch it on my channel
@JaideepKane already seen.
Phase 2 shivay kahi fayda nahi
You are showing totally wrong maps of Metro lines at 2.31 line 2b and line 7 are till Dahisar. Please see at what location does Dahisar come in actual map. You need to study maps of mumbai before making such videos. I am damn sure you do not stay in Mumbai.
Please see the description. I have made maps for just reference purpose. not accurate or not scaled.
and I stay in Mumbai from last 20 years thank you
@@JaideepKaneok sorry bro i told this because i am your subscriber and a fan also so to rectify your mistake told you... nothing personal
2029
Kalyan is the WORST PLACE in MUMBAI , Not at all commutable by Road, Train and water ways
Bhivandi People could connect to thane before Kalyan People
Bhiwadi has 80 percent commercial area
Kalyan is 80 percent residential area
Only God can check on what basis they are planning
I wish I could get shifted Pune or Nashik or Ahmedabad or else 😢😢😢
Mumbai is the PLACE where people trade their precious LIFE for some extra money
2025 tak chahiye