Sennebogen 870R unloading dredged spoil with 6.000 liter Kinshofer grab.

Поділитися
Вставка
  • Опубліковано 25 жов 2017
  • Unloading dredged spoil with over 5 cycles a minute with 6 m3 grab. Because the material is very much fluid I can grab without first completely opening the bucket which saves a lot of time. However the fluid material costs loads of time cleaning up.
    This was 741m3 in a little less than an hour.
  • Авто та транспорт

КОМЕНТАРІ •