Next bed prep in mid-section

Поділитися
Вставка
  • Опубліковано 16 вер 2024
  • Spent about 2 hours this evening up to 9pm preparing and clearing the ground for the next bed.
    Mini mammoth teak with this prep as this section had a mix of heavy slabs, stone paving slabs and carpet tiles as well as some nasty old roots
    Managed to sort it, but just need to section it off with butterfly panels as a raised bed and level the soil.

КОМЕНТАРІ •