InteliGen 1000 Case Study: Back-up Power for a Midlands Hospital
Вставка
- Опубліковано 16 вер 2024
- Power Control and Automation Solutions Ltd (PCAS) partnered with ComAp recently and installed InteliGen 1000 at a back-up power plant in a hospital in the Midlands, United Kingdom. PCAS is a mission-critical power solutions company working internationally on data centres, hospitals, CHPs, gas peaking plants, with over 1000MW of power installed and commissioned across the UK.
“The InteliGen 1000 gave us the power we needed to run this application. The pre-programmed functions allowed us to put the engine into operation very quickly and the large in-built PLC interpreter allowed us to implement the specific customer requirements easily and quickly on our own. Cyber security, redundancy options, and G99 readiness were the main attributes for selecting this controller,” said Stuart Turner, Managing Director at Power Control and Automation Solutions Ltd.
For more information on the case study, please go to www.comap-contr...
Very nice
Good job. Well done.
Plz help me from synchonizing panel 3rd genset will be shut down
Genial
Please help me. Alarm stp gcb fail when start generator
the controller is requesting a breaker to open or close but the ACB isn't doing it for some reason.
Black horse