КОМЕНТАРІ •

  • @cncshrops
    @cncshrops 4 роки тому +8

    Signalling: the under-celebrated heart of railway operation.

  • @GreatEastonRailway
    @GreatEastonRailway 6 років тому +5

    Brilliant. Thanks for taking the time to show us round. Always wondered how it worked in practice. Love the whole series. Keep it up 😊

  • @davidrice9880
    @davidrice9880 6 років тому

    Thank you for another gem from North Wales.

  • @paulhepworth
    @paulhepworth 6 років тому

    What a splendid hybrid installation..although the block shelf looked a bit wobbly...! Good to see you in action Peter.

  • @arlandprasetya5571
    @arlandprasetya5571 4 роки тому +1

    BeautifuL

  • @quicksilver238
    @quicksilver238 4 роки тому

    What a nice birthday present!

  • @blindpugh12
    @blindpugh12 6 років тому +1

    Excellent! very informative.

  • @jackharrison6771
    @jackharrison6771 5 років тому +1

    "Moving Pictures yes; in more ways than one".

  • @dhaynes4515
    @dhaynes4515 6 років тому

    Very well done!

  • @gasmith841
    @gasmith841 6 років тому

    Wonderful

  • @danfisher1530
    @danfisher1530 5 років тому

    Is the point detection done by reed switches on the points?

  • @AndreiTupolev
    @AndreiTupolev 6 років тому

    So the points are controlled by the lever frame and the signals by the panel then? An interesting hybrid system. Was the frame built new for here or was it recycled from somewhere?

    • @FfWHR-MovingPictures
      @FfWHR-MovingPictures 6 років тому

      I understand the frame is of LNWR origin but with SR legend panels.

  • @kae4466
    @kae4466 5 років тому

    is this line still run by volunteers , or has it become a commercial concern.? thanks . interesting descritption of operations .