Kiverco Bespoke Plant. Client:Collards. Location: Oxfordshire, UK. Application: C&D.

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • This Ks 514 comprises of :
    - Feeder
    - Vibrating Screen
    - ASU (mid-size)
    - Magnet (mid-size)
    - Air Knife (oversize)
    - 3-bay sorting station
    - Magnet
    - Generator or mains power
    The Ks 514 installed at Collards can recover up to 8 products from mixed C&D waste.
    The throughput is up to 30tph.

КОМЕНТАРІ • 1