is this s chip seal as see no smoking(possibly cold mix) asphalt and i see no tack on the concrete driveway and do you concrete broom seal at the end to prevent delamination.due to thickness
So you are saying it makes business sense to spend thousands on a small driveway paver when i would use it 6-7 times a year or pay someone to do it for twice the cost i can do it for? It takes us an hour to hour and fifteen minutes to do a driveway. Where is the waste?
@@cressonpointpropertiesllc6812 🤣🤣🤣 an hour to do a driveway that size??? 2 men with a wheelbarrow would have that wheeled and tipped out and your rake man leveled within 30 minutes tops. At least you wouldnt have 4 men standing or sitting doing nothing. How long did it take to fill the skidsteer then the dragbox and then pull one pass? That's where your waste of time and money is.. and yes it costs thousands for your skidsteer and dragbox and also paying skidsteer driver and the 2 men on the dragbox doing nothing while you load and pull. Waste of time buddy... oh and money 👍
@@anthonysands7260 Our average driveway is 14 tons, good luck wheelbarrowing 14 tons or skid steering matter of fact in 30 minutes. It works perfect for our application.
@@cressonpointpropertiesllc6812 that jobs not 14 tonnes buddy maybe 9 tops and with that depth probaly less. Everyone to there own but still a waste of time.
@@anthonysands7260 Yes that particular job you’re right. I’m talking about a brand new driveway prepped modified 22 feet wide by 35 feet long we do in an 1hr to 1hr 15mins
The cat stickers almost make it look like a real product 😻
Lol. Not the first time we have heard that. Thanks
Looks good enough to me, saves a sore back and it's laying it just fine. I've wraked hundreds of tons of tarmac so I speak from experience lol 😂👍🇬🇧
Nice job 👍🇬🇧
I was just thinking of this when the woman yesterday told me my drag box wasent going to pave her driveway I should put a leeboy logo on it lol
Man that’s a deep drag box I like it, you’ll get longer pulls
Thanks custom made by one of our crew members. It does about 18’ on a pull laying 3 1/2 thick
Would love to see your design specs on this. Looks to work very well and would help our crew doing this by hand.
is this s chip seal as see no smoking(possibly cold mix) asphalt and i see no tack on the concrete driveway and do you concrete broom seal at the end to prevent delamination.due to thickness
Have you tried running crushed rock thru it yet?
I never heard of that asphalt paver attachment before.
I can lay that asphalt with just the skid steer all day
Where do you get one of those drag boxes at?
Is that binder?
I would like to see the specs on this can you share them?
Like to see build details of this. I need one to pave cart paths on my golf course
How soon do you want to do your project. I could make you one . This is cole from Tiktok btw
@@cressonpointpropertiesllc6812 Hey Cole, not a huge hurry, DM me some pricing on TikTok please?
@@Randellallen65 give me a follow and then we can. It wont let me until u follow
Me too
Chinnnn itttttt
Why is the skidsteer not digging out the back of that truck it would make it so much faster
looks like a nightmare 😅
Buddy I would love to talk you about making one cole
Sounds great, send me an email with your number and ill give you a call. Cole@cressonpoint.com
This is the biggest waste of time i have ever seen.
So you are saying it makes business sense to spend thousands on a small driveway paver when i would use it 6-7 times a year or pay someone to do it for twice the cost i can do it for? It takes us an hour to hour and fifteen minutes to do a driveway. Where is the waste?
@@cressonpointpropertiesllc6812 🤣🤣🤣 an hour to do a driveway that size??? 2 men with a wheelbarrow would have that wheeled and tipped out and your rake man leveled within 30 minutes tops. At least you wouldnt have 4 men standing or sitting doing nothing. How long did it take to fill the skidsteer then the dragbox and then pull one pass? That's where your waste of time and money is.. and yes it costs thousands for your skidsteer and dragbox and also paying skidsteer driver and the 2 men on the dragbox doing nothing while you load and pull. Waste of time buddy... oh and money 👍
@@anthonysands7260 Our average driveway is 14 tons, good luck wheelbarrowing 14 tons or skid steering matter of fact in 30 minutes. It works perfect for our application.
@@cressonpointpropertiesllc6812 that jobs not 14 tonnes buddy maybe 9 tops and with that depth probaly less. Everyone to there own but still a waste of time.
@@anthonysands7260 Yes that particular job you’re right. I’m talking about a brand new driveway prepped modified 22 feet wide by 35 feet long we do in an 1hr to 1hr 15mins
Very serious brother let me know send me a email or something