DRONE VIDEO: EDSA traffic after Kamuning Flyover's partial closure
Вставка
- Опубліковано 1 тра 2024
- Drone footage by ABS-CBN News showed the traffic situation along EDSA on Thursday, a day after the partial closure of the Kamuning Flyover.
The closure of the Kamuning Flyover southbound will give way to retrofitting works.
Only buses using the EDSA bus carousel are permitted to pass through the flyover during this period.
The retrofitting works are expected to last for six months before the EDSA Kamuning Flyover reopens to other motorists.
Drone video by Nestor Licuanan, ABS-CBN News
For more ABS-CBN News, click the link below:
• Breaking News & Live C...
Check out the latest news on upcoming Halalan 2022 here:
• Halalan 2022
To watch the latest updates on COVID-19, click the link below:
• COVID-19 Updates
Subscribe to the ABS-CBN News channel! - bit.ly/TheABSCBNNews
Watch the full episodes of TV Patrol on iWantTFC:
bit.ly/TVPatrol-iWantTFC
Visit our website at news.abs-cbn.com
Facebook: / abscbnnews
Twitter: / abscbnnews
#ABS-CBNHighlights
#LatestNews
#ABSCBNNews
Mabuti na lang nag-drive ako sa NLEX Connector papuntang Ortigas
ganda ng drone
Sa totoo lang mali qng plano dyan sa pagawa ng mrt dapat elevated yan katulad dito sa japan kapag nasa city naka elevqted yan pwera lang sa mga probinsya
Talagang maraming mali dyan sa MRT lalo na sa bandang Makati at Pasay-Taft doon dapat lalong elevated. Makatitipid kasi sila kapag ground level, sadly pati sa LRT (being constructed) along Commonwealth Ave. maraming parte ay ground level rin.