As per IS CODE kaam karega koi contractor toh usko ghar se paise lagane padegne, qki makan malik ko chahiye sasta sasta or aaj kal koi construction contractors kaam hath se nahi jane dena chahta hai, or Jo accha or A class kaam karte hai woh meri tarah araam karte hai saal me 2-4 kaam hi karte hai.itne bhi mil jaye toh badi baat hai. 90 % contractors grass cutting work hi karte hai,or woh bhi bade bade contractors. In Sabhi ki aukat jab koi earthquake aayega or inke buildings giregi tab pata chal jayega, qki yaha india me koi stricts rules hai hi nahi practically.structural engineer apni sahi drawings de deta hai site per kaam hi apne alag level ka desi jaisa R.C.C WALA karta aaraha hai kar raha hai,or site eng.ko khud pata nahi sahi galat,jaisa hai chalne do.
As per structural engineer drawings, baki man marzi se jaise lena hai le lo kaun aakar rok raha hai. Bhai aisa hai,bina structural engineer ke ghar banana woh bhi column structure is very dangerous, qki R.C.C WALE saare ek number ke murkh hote hai.maan kar chalo woh 100% galat kaam hi karega,apni labour bachane ke chakkar me or dusra usne jo galat kaam sikha hai woh wahi karega.isly as per drawing kaam karwao or safe raho, nahi toh marna toh ek na ek din sabko hi hai,phir building me dab kar mare ya koi or tariqa se.
@@JDShorts-kp6koIS code 456-2000 ke anusar opc cement lete hai toh minimum 7 days hai. Admixture ya blended cement lete hai toh 10 days and hot weather hai toh 14 days. Yani kul mila kar 7-14 days hai, aap 14 days minimum curing karenge toh column ko acchi khasi strengthil gayegi.
@@TecCivilofficialwoh height pooch Raha hai. 3-4 inches toh honi chahiye, taki farma acche se lag sake or column ek edum sidha hi Lage or acche se casting ho sake.
मिट्टी की दीवाल में छत ढलने के लिए सरिया और साइज
Coluam uthene ke 5 saal bad roof dalai kar sakte hai kaya?
ASTM ke hisab se 5000 psi ya 4000 psi ka strength 100% aajata hei. 70% strength 14 din me aajata hei agar mixture sahi ho to.
Right sir
16-24 hr
super like L 36 my friend nice sharing 👍👍👉❤❤❤❤❤
Sir Mera mistery kolum dhalne ke 2 ghante bad sahul Kiya hai kay y sahi hay kolum m kreck to nahi aayga
Column casting ke bad door level beam kaise de is per video banao
Okay
Very helpful
6year ho gaya hai abhi chat Dalai kar sakte hain kya
7 fit column dhalne ke kitne din ke agla 5 fit dhalna chahiye?
झोपड़ी वाली छत मे सरिया कैसे लगाए मध्यप्रदेश से
shaktimaan ko theka de kar
@@shahlalhashmi 😂
Humko bolo
Jis prakar anda murgi deta hai
Column ki curing 3-4 din hua ab 20 din baad se phir se curing karne ka koi fayeda
As per IS CODE kaam karega koi contractor toh usko ghar se paise lagane padegne, qki makan malik ko chahiye sasta sasta or aaj kal koi construction contractors kaam hath se nahi jane dena chahta hai, or Jo accha or A class kaam karte hai woh meri tarah araam karte hai saal me 2-4 kaam hi karte hai.itne bhi mil jaye toh badi baat hai. 90 % contractors grass cutting work hi karte hai,or woh bhi bade bade contractors. In Sabhi ki aukat jab koi earthquake aayega or inke buildings giregi tab pata chal jayega, qki yaha india me koi stricts rules hai hi nahi practically.structural engineer apni sahi drawings de deta hai site per kaam hi apne alag level ka desi jaisa R.C.C WALA karta aaraha hai kar raha hai,or site eng.ko khud pata nahi sahi galat,jaisa hai chalne do.
Sr, please btaye ki ek room 10*10 and ek bathroom 6*4 ko banane le kya cost aayegi
1 lakhs ke karib
कॉलम में अधिकतम कितनी लम्बाई का सरिया काम में ले सकते है?
As per structural engineer drawings, baki man marzi se jaise lena hai le lo kaun aakar rok raha hai. Bhai aisa hai,bina structural engineer ke ghar banana woh bhi column structure is very dangerous, qki R.C.C WALE saare ek number ke murkh hote hai.maan kar chalo woh 100% galat kaam hi karega,apni labour bachane ke chakkar me or dusra usne jo galat kaam sikha hai woh wahi karega.isly as per drawing kaam karwao or safe raho, nahi toh marna toh ek na ek din sabko hi hai,phir building me dab kar mare ya koi or tariqa se.
Colum ki Quiring kitne din karna hai
Kam se kam 7 din
@@TecCivilofficialIS CODE ME KYA H
@@JDShorts-kp6koIS code 456-2000 ke anusar opc cement lete hai toh minimum 7 days hai.
Admixture ya blended cement lete hai toh 10 days and hot weather hai toh 14 days. Yani kul mila kar 7-14 days hai, aap 14 days minimum curing karenge toh column ko acchi khasi strengthil gayegi.
लेकिन सभी कॉलम को 26-27 दिन नहीं मिल पाता हैं .
Q column kahi bhag jaate hai kya. Kya murkho wali baat karte ho bhai.
Sir kaya aap apna no de sakte hain
स्टार्टर की क्या साइज रखते है?
Column ki size ke hisab se
@@TecCivilofficialwoh height pooch Raha hai. 3-4 inches toh honi chahiye, taki farma acche se lag sake or column ek edum sidha hi Lage or acche se casting ho sake.