How to Create Surface Based Schedules and Formwork Takeoffs in Archicad

Поділитися
Вставка
  • Опубліковано 11 гру 2024

КОМЕНТАРІ • 23

  • @YOMOODY
    @YOMOODY 3 роки тому +2

    Your channel is like the next level of Archicad practice !

    • @CONTRABIM
      @CONTRABIM  3 роки тому +1

      Thanks Mahmoud for the comment!

  • @davincijn6207
    @davincijn6207 4 роки тому +3

    It's great to have you back . Well done

  • @vdc-boge382
    @vdc-boge382 3 роки тому +1

    Great! I have been puzzled by concrete formwork a few month, and you give me a guide to solve this problem.

    • @CONTRABIM
      @CONTRABIM  3 роки тому

      Great, yes this is certainly one method that works for the formed areas! There are some other ways of doing this as well, but this is probably the most visual "formwork painting" style

  • @mahmoudqenawi7100
    @mahmoudqenawi7100 2 роки тому

    Thank you Jon, really valuable.

  • @conmes3077
    @conmes3077 4 роки тому +2

    Thx John very helpful 👍🏻

    • @CONTRABIM
      @CONTRABIM  4 роки тому +1

      Thanks! Surface takeoffs are definitely a less used method, but can be useful in some cases...

    • @conmes3077
      @conmes3077 4 роки тому

      @@CONTRABIM yes....😊 Little miss you on UA-cam 😁

  • @Rsrigo1
    @Rsrigo1 4 роки тому +3

    That's some high quality stuff!

  • @dawidfedko8360
    @dawidfedko8360 4 роки тому +1

    Thank you!

    • @CONTRABIM
      @CONTRABIM  3 роки тому

      Thanks for the inspiration on this one!

  • @nemeseduard4736
    @nemeseduard4736 4 роки тому +1

    Great! Keep it up! Very useful material!!!!!

    • @CONTRABIM
      @CONTRABIM  4 роки тому

      Thanks Nemes! We'll be back with more videos soon!

  • @realpulsecoin
    @realpulsecoin 3 роки тому

    Great content! 👍

  • @ebtikarco6566
    @ebtikarco6566 3 роки тому +1

    You are a wonderful person .. I have a question, where do you get the Formwork texture ?

    • @CONTRABIM
      @CONTRABIM  3 роки тому

      I created it in powerpoint:) Easy to setup based on a 1x1 grid, laid out into 4x8 panels which is the typical formwork panel size.

  • @gaetanocasanova4218
    @gaetanocasanova4218 4 роки тому +1

    Grazie!!!!

  • @ShaoYenChen
    @ShaoYenChen 2 роки тому

    Thanks for the great video. How would it be if there are partially dry walls with other walls built in concrete? How to exclude only the dry walls?

    • @CONTRABIM
      @CONTRABIM  2 роки тому

      I'd probably recommend using a different method for that, likely a component schedule to pull out area of drywall