Review of Well Injection tests - Saad Ibrahim, P. Engineer, President Petro Management Group

Поділитися
Вставка
  • Опубліковано 26 бер 2016
  • This video is from the Lunch and Learn seminar: petromgt.com/lunch-learn/revie...
    Agenda/outline:
    Well injection tests have been used in the oil industry for various applications. In the early 1960’s injectivity fall-off tests and the Hall Plots were used to evaluate the injectivity efficiency of water disposal and injectors. With the shift to unconventional activities, step rate tests and Diagnostic Fracture Injection test (DFIT) have been widely used to obtain vital information to design frac treatments. Various case studies will be presented to illustrate the benefits of injection tests for the following applications:
    1. Optimize fluid injectivity by determining wellbore skin factor from injection/fall-off tests.
    2. Determine the closure pressure for frac design
    3. Determine leakoff types and indentify the presence of natural fractures.
    4. Determine wellbore pressure drop in perforation intervals and well tortuosity
    5. Determine the sealing injection pressure for EOR and steam injection projects
    6. Evaluate the draw down limit during well flow-back period following frac treatment.
    Full course "Review of Well Injection tests": petromgt.com/training/review-o...

КОМЕНТАРІ • 5

  • @weiquandong6851
    @weiquandong6851 6 років тому

    Great presentation and very helpful in real world!

  • @alexnini2995
    @alexnini2995 5 років тому +1

    Good Video, Thanks Saad and keep it up.

  • @jamesvrtis8863
    @jamesvrtis8863 5 років тому +1

    Are there anymore of these lectures available? This one alone has been really helpful.

  • @MOSSES_ID
    @MOSSES_ID 8 років тому

    thanks for ur share..

  • @omarstreetrod
    @omarstreetrod 8 років тому +1

    Thank you Saad for uploading this video. Really helpfull!