Wind Turbine Cable Installation | Cable Laying | Extreme engineering

Поділитися
Вставка
  • Опубліковано 12 тра 2020
  • laying a 4km single unit underwater cable is not an easy task at all. Orient Energy Engineers took this task seriously and get it done very professionally.
    The project is the total of 50 MW wind turbine farm having 25 turbines of 2MW each. The project is located in the coastal area which in time oh high tide give great challenges to work in.