Boogies Trains at: Stevenage - 11 August, 2023

Поділитися
Вставка
  • Опубліковано 28 лис 2024

КОМЕНТАРІ • 6

  • @robertmwamba945
    @robertmwamba945 Рік тому +3

    Some of the dirt on the ThamesLink Class 700/1's bogies have got cleaned off

  • @deauvilledad07
    @deauvilledad07 Рік тому +3

    Excellent as always Mr Boogie. The visual commentary is always excellent, well done 🤓

  • @maimadha
    @maimadha Рік тому +2

    Great video!

  • @alexstrains3007
    @alexstrains3007 Рік тому +1

    Peterborough was affected by the ban, our service had half the usual service it would normally have

  • @Andrewjg_89
    @Andrewjg_89 Рік тому +1

    Since platform 5 was built to allow Class 717 to terminate from Moorgate via Hertford North. It has helped with the bottleneck on the East Coast Main Line and Thameslink trains mostly serving Stevenage using platforms 4 and 1. And faster trains passing through platforms 3 and 2.

  • @DKS225
    @DKS225 Рік тому +3

    Someone should probably have mentioned to Dr Beeching to not close The Harrogate-Ripon section as it probably would have been an ideal secondary route should the primary section between Kings Cross-York be closed for maintenance in the same way he should have not closed the route between Exeter-Plymouth via Bude and Padstow especially when the only route to Plymouth from Exeter is on some occasions held to ransom by the winter weather through Dawlish. Just a thought.