How to set up Altrex MiTower
Вставка
- Опубліковано 1 жов 2024
- This video is showing a 4.2m platform height set up with working height of 6.2m
For rental please go to www.scaffoldingrentalsingapore.com
For sales please go to www.cycc.com.sg
If you have any questions about using tower scaffold please feel free to drop a comment below and we will get back to you.
Great instruction thank you
Well done. Thank you for sharing. Really useful.
Can you reach a roof eaves 5.5m height?
TheQqryq80
Working height of around 6m hope that helps 👍
I’m a scaffolder a 21ft pole is 3 ft below the gable end so u would need a working hight of 7.2m to reach the eaves safely
Hi, Thanks for this very useful video. Can ask what is your experience of using it outdoors? I'm a bridge inspector, and usually use much larger Advance Guard Rail scaffolds to inspect, but these seem must more portable. How to they deal with uneven ground? Obviously you can adjust the levelling of the wheels, but can that be done once the tower is erected, or does it need to be disassembled before you can adjust at all? Thanks very much!
Hi Carlos it will be easier to adjust the leveling if you dismantle the scaffold. The weight of the erected scaffold is heavy and making adjustment upwards or downwards leveling more difficult.
On the safety aspect the scaffold may topple while you are doing the leveling.
If you are using on slope I suggest to use jackbases instead of wheels for safety reasons.
Please feel free to drop your replies here if you have further questions on levelling the scaffold. I will be glad to help.
@@cyccaccess Thanks very much for your response! I'll look into the jackbases.
Didn’t show any wheel adjustment options.
Nice
Great video!
Cool
Where can you buy one and how much are your tower
Thank you so much