Front discharge concrete mixer

Поділитися
Вставка
  • Опубліковано 4 гру 2024

КОМЕНТАРІ • 27

  • @bobbywilliamson6139
    @bobbywilliamson6139 2 роки тому +2

    Good job young man,only thing at this time,am sure you’re much better now,lift your chute up and the mud will spread better,I’m 7 yrs in,I’m still learning brother 💯👍🏿

  • @billbixby5304
    @billbixby5304 7 років тому +6

    Great job driver its hard pouring for new finishers and Bob Villa's

  • @josephbeattie5525
    @josephbeattie5525 4 роки тому +2

    Good job driver. A true professional will adjust his ways to the crew. I could tell thats exactly what you did 😁

  • @mikecaldwell7992
    @mikecaldwell7992 10 місяців тому +1

    Some of these guys love dancing with the chutes. They keep doingbthat and i will pile it and make them drag it to the edges.

  • @brentmiller6668
    @brentmiller6668 8 років тому +2

    Ignore the one dude this driver did a great job!

  • @sambrackbob6259
    @sambrackbob6259  9 років тому +2

    Yeah, that crew wasn't all there if you know what I mean. But I believe it was a 97 advance, work for a different company now.

  • @AQLandscaping
    @AQLandscaping 4 роки тому +1

    COD at its finest

  • @iwannaapple7190
    @iwannaapple7190 6 років тому +2

    Thats the kind of crew that doesn't know how to get in front of the chute while they wear rubber boots for nothing. then on top of that, they stop you every five feet and hold up 2 fingers for 2 gallons.

  • @pkrfn53
    @pkrfn53 9 років тому

    Old man needs to get out the way! You really gotta chatter them chutes! What year is your truck? I drive a 2014 Oshkosh front quad axle with steerable pusher/tags.

  • @Jonathan-uc7do
    @Jonathan-uc7do 6 років тому +2

    No rebar?

  • @almighty8185
    @almighty8185 5 років тому

    Is the front end easier than the rear end or is the same?

    • @robertbaker50
      @robertbaker50 4 роки тому

      I perfer front, its alot more fun.

  • @CarLos-mp7pe
    @CarLos-mp7pe 9 місяців тому

    Migos would’ve been done by now

  • @lilyslife47
    @lilyslife47 2 роки тому

    nothing worse than guys that have no clue what they are doing trying to guide you lol..

  • @RelaxedReadz
    @RelaxedReadz 8 років тому

    This is an extremely slow pour.lol

  • @fike301
    @fike301 3 роки тому +1

    I can normally tell by footwear level of experience....obviously these are wanna be"s.
    1) bare hands in crete
    2) constantly flinging mag float
    3) wrong shoes! only 1 had rubber boots

    • @fike301
      @fike301 3 роки тому +1

      also no rewire....customer getting ripped here!

  • @bass305-HCCA
    @bass305-HCCA 3 роки тому

    Mixer driver gets a C at best

  • @6stiffy9
    @6stiffy9 6 років тому

    Sorry but average at best.

  • @born2befreeeagle
    @born2befreeeagle 9 років тому

    wow this mixer driver is suck , but aleast the cocrete is in the ground ,poor crew ,I'm certified mixer driver and this guy is terrible

    • @patrickwardlaw1027
      @patrickwardlaw1027 7 років тому

      And not everyone is perfect. The only way to get better is to practice. I'm fairly new into the industry. I'm still learning, the contractors we work with know who is still learning. As long as you are making positive improvements they will not say anything at all.

    • @Jonathan-uc7do
      @Jonathan-uc7do 6 років тому

      Wow. You have to get certified to pour concrete? Like take a test?

    • @jakethesnake4971
      @jakethesnake4971 3 роки тому +2

      I hope you're joking man. The crew is ridiculous, they don't have boots so that means they're always in the way of the chute. I could go on and on about the crew. Trust me the driver did fine.