Eastoke Point construction of Rock Revetment (2013) Westward View

Поділитися
Вставка
  • Опубліковано 5 лют 2025
  • Time lapse video of entire construction of £5 million rock armour flood risk scheme at Eastoke, Hayling Island. Scheme constructed to reduce flood risk to properties on Hayling Island. Views shown are from west and east of the construction area.
    Scheme designed and delivered by the Eastern Solent Coastal Partnership in conjunction with Raymond Brown Construction Ltd and The Environment Agency

КОМЕНТАРІ • 3

  • @nlo114
    @nlo114 11 років тому +2

    Then came the winter storms. The wind howled, the waves thundered in, and 50% was gone in 5 days.

  • @michaelmixon2479
    @michaelmixon2479 2 роки тому

    I think a breakwater structure would be a better solution.