Heat Exchanger Re-tubing Job (Tube Cutting)

Поділитися
Вставка
  • Опубліковано 1 жов 2024
  • Re-Tubing of Heat Exchangers done to replace all damaged / plugged and thinned tubes with new one.
    Here we cut the Tube to Tube Sheet Joint (TTSJ) and pull the tubes of U tube Bundle.
    Here we use old Tube sheet, baffles , Tie rod with new tubes.

КОМЕНТАРІ • 35

  • @arslanshahzad4003
    @arslanshahzad4003 9 місяців тому

    Please wear hand 🧤 gloves

  • @hssteelvita
    @hssteelvita 3 роки тому +1

    I m tube to tubesheet welder,

  • @NareshGosine-du6oh
    @NareshGosine-du6oh 4 місяці тому

    How to remove a tube from the bundle

    • @amitkumar22144
      @amitkumar22144  3 місяці тому

      Welded Tube to Tubesheet Joint (TTSJ):
      Tube is removed by cutting the TTSJ weld joint.
      Extension Weld Joint: But pulling the tube, if feasible other wise by cutting

  • @Akshai009
    @Akshai009 3 роки тому +2

    How to pull out one tube and replace it with another one

    • @amitkumar22144
      @amitkumar22144  3 роки тому

      TUBE IS WELDED ONLY AT TUBESHEET WITH SEAL WELD / STRENGTH WELD OR SOME TIMES ONLY EXPENSION.
      FOR REPLACING THE TUBE , WELD SHOULD BE CUT ✂️ FROM WELD JOINT WHICH WE CALL TUBE TO TUBESHEET JOINT(TTSJ) .
      AFTER PUTTING NEW TUBE IT SHOULD BE RE-WELDED.

    • @Akshai009
      @Akshai009 3 роки тому

      @@amitkumar22144 Tubes are supposed to be flared at the tube sheet outer end right
      Once we need to renew it firstly we will be collapsing the flare from both ends and now we will be using the expanding tool to expand the tube from the casing and guide it out and.then we insert new tube and flare at ends
      Is this procedure correct?

  • @giorgoskoukounaris7816
    @giorgoskoukounaris7816 4 роки тому +1

    Amateurs ...with this way maybe u need 2 years work

  • @ponkrapujari679
    @ponkrapujari679 3 роки тому +1

    wrong and false work.

  • @paragmayekar9800
    @paragmayekar9800 4 роки тому +1

    Mahashesha Enterprise
    We taking all types of expansion work..

    • @amitkumar22144
      @amitkumar22144  4 роки тому

      Since how many years you are in this field.

    • @paragmayekar9800
      @paragmayekar9800 4 роки тому

      @@amitkumar22144 my father last 30 years and me last 10 years

  • @humairareajali969
    @humairareajali969 7 років тому +1

    Good job

  • @SUBHASHYADAV-be2mn
    @SUBHASHYADAV-be2mn 8 місяців тому +1

    Super

  • @lovi90696
    @lovi90696 6 років тому

    Bullshit......

  • @altayaga4275
    @altayaga4275 6 років тому +1

    how can open tubes pack from sheel pleaaaaase

    • @amitkumar22144
      @amitkumar22144  6 років тому

      By cutting old tube and inserting new tube in the shell.

    • @altayaga4275
      @altayaga4275 6 років тому +2

      Mech Mishra thank but how can seprate sheel for reach to the tubes?

    • @amitkumar22144
      @amitkumar22144  6 років тому

      By expansion of tubes and or by welding tube to tube sheet joint or both.

    • @amitkumar22144
      @amitkumar22144  6 років тому

      With the help of inside skeleton / baffle , each tube reach exactly the same position

  • @wjjmlg
    @wjjmlg 6 років тому

    how do you pull the copper tubes out?

  • @pardeepdemiwal3257
    @pardeepdemiwal3257 4 роки тому

    sir jo machin aap chala rhe h please sir esh ki repairing k bare m btaoo sir
    m sir electrician hu sir

  • @yungdon7811
    @yungdon7811 Рік тому

    Please what’s the name of the machine used here

  • @RajeevKumar-zd8yk
    @RajeevKumar-zd8yk Рік тому

    इस मशीन का नाम किया है

  • @RajuPatel-pd9ye
    @RajuPatel-pd9ye 2 роки тому

    Kya naam h es machine ka