Hello, congratulations for such a great video and sharing your knowledge. I would like to let you know about a doubt regarding annex F minute 14.33. In my case all combined conditions (F.1, F.2, F.3, F3.4 and F.5) say PASSED, but the Overall Status (second column of table in the page 5) says Failed. Despite that, Can I consider that my completed system is PASSED?
Great, well explained, detailed and with sincerity, looking forward for Dynamic Analysis detailed series.
Thanks
Later I will work on that for sure
Very well explained, it's really good since you show every step one by one 👍🏻
Thank you
روعة مهندس متمكن وشرحك ممتاز وشخصيا استفدت كثيرا
🙏🏻🙏🏻
Thank u bro
Please go on and make more videos.
جزاك الله خيرا 🌷
what to do when failure of nozzle happen as per API 610
Very rare and useful informations you share, thanks a lot. Why did you stop?
Hello, congratulations for such a great video and sharing your knowledge. I would like to let you know about a doubt regarding annex F minute 14.33. In my case all combined conditions (F.1, F.2, F.3, F3.4 and F.5) say PASSED, but the Overall Status (second column of table in the page 5) says Failed. Despite that, Can I consider that my completed system is PASSED?
Thank you sir 🙌
Dear Sir,
kindly post top suction and top discharge pump analysis
Sir Please make one detailed video on NEMA SM23 TURBINE ANALYSIS
Thanks a lot
You welcome 🙏🏻
May I know your email addres sir?