How do you add foam closure strips if you aren’t screwing through the valley flashing? These install instructions seem to differ from most panel manufacturer install instructions in that regard We have found the foam closure strips a bit difficult to work with, I’d love a video showing how you apply these (and sealant) when you’re installing panels.
Could you use this technique to join two metal buildings together, and how long can you get that W flashing in? Current building is 40' and want to place another 40' building beside it...+
They normally come in 10 foot lengths. I would go to your local metal roofing manufacturer (not a home center like Lowes or HD) and ask them. Are you creating a valley between the buildings or just going straight with it? In other words, is the new building at a right angle or T to the existing or continuing straight to make a longer building? If it's straight, just use a roofing panel to cover the join and go on with it.
Have any videos on how to finish that ridge to your right of the valley? Especially that triangle area?
I am going to cover my mobile home roof so I watch these videos repeatedly.
Very helpful.. thank you
How do you add foam closure strips if you aren’t screwing through the valley flashing? These install instructions seem to differ from most panel manufacturer install instructions in that regard
We have found the foam closure strips a bit difficult to work with, I’d love a video showing how you apply these (and sealant) when you’re installing panels.
Thank you! Very helpful.
Thanks very straight forward!
Hello, I have a question:
How is the flashing installed if the bottoms are at different elevations? One roof comes in about 18" above the other?
I want to see how you do the ridge cap where to two ridges come together i even bought the DVDs this guy sells and he still never shows
Could you use this technique to join two metal buildings together, and how long can you get that W flashing in? Current building is 40' and want to place another 40' building beside it...+
They normally come in 10 foot lengths. I would go to your local metal roofing manufacturer (not a home center like Lowes or HD) and ask them. Are you creating a valley between the buildings or just going straight with it? In other words, is the new building at a right angle or T to the existing or continuing straight to make a longer building? If it's straight, just use a roofing panel to cover the join and go on with it.
Thank you!
How much u bend end of vally catch water
Wouldn’t a hem ontop be good
Doesn't that hem on the valley peace hold the panel up the thickness of the hem
i have the same question?
Yes it does lift it up a bit but it's not too noticeable in the end. I think it's worth it as an insurance policy against leaks.
👍👍👍👍👍👍👍👍
❤
Surely you don't cut every panel with snips.
Very helpful, Thank You!