Partial discharge testing on power transformers

Поділитися
Вставка
  • Опубліковано 2 лют 2025

КОМЕНТАРІ • 17

  • @Vision267
    @Vision267 Місяць тому

    what is the procedure to select a PD tester for transformers

  • @romitshah8399
    @romitshah8399 4 роки тому +1

    Which are the different methods for the measurement of partial discharge (PD) in power transformer.

    • @omicronenergy
      @omicronenergy  4 роки тому +2

      Dear Romit,
      There are many different methods to perform PD measurements on power transformers.
      Main offline methods:
      - According to IEC 60270: using coupling capacitor or bushing tap (single and three phase)
      - UHF measurement using UVS 610 sensor at the valve (ultra-high frequency antenna)
      - Acoustical localization using PDL 650
      Best Regards
      your OMICRON team

  • @sueandlindsay1777
    @sueandlindsay1777 2 роки тому

    For a site test what is the detection bandwidth of the MPD800 ?

    • @omicronenergy
      @omicronenergy  2 роки тому

      Dear Sue and Lindsay,
      thanks for your comment and for your interest to our videos :)
      The MPD 800 offers a wide range of filters. The bandwidth and center frequency can be adjusted for the best signal to noise ratio at site or can be kept the same as for the FAT result to have comparable settings. For the charge measurement (QIEC value), the center frequency and the bandwidth are usually set in alinement with IEC 60270. For RIV testing the CISPR or NEMA standards are followed. For more information, please visit: www.omicronenergy.com/en/products/mpd-800/
      Best regards,
      your OMICRON team

  • @pawankumar-gj7sb
    @pawankumar-gj7sb 4 роки тому +1

    Sir is this online or offline testing on transformer.

    • @omicronenergy
      @omicronenergy  4 роки тому

      Dear pawan kumar,
      thank you for your interest!
      There are only offline measurements shown in this video but online measurements are possible as well.
      Best Regards,
      your OMICRON team

    • @sportnikabel
      @sportnikabel Місяць тому

      This is done on deenergized transformer, with open primary and secondary disconnectors. The environmental factor need to be considered (humidity and wet surfaces should be avoided while testing indoors ),as it will influence in results.

  • @himariarosa
    @himariarosa 4 роки тому

    Good day sir, if online measurement is possible.. can I ask if Mathematical model of PD in transformer is possible?

    • @himariarosa
      @himariarosa 4 роки тому

      Thank you because it's my topic for our thesis 🙏

    • @omicronenergy
      @omicronenergy  4 роки тому +1

      Dear Mary,
      thank you for your interest!
      Simulating PD is a topic of research and the question highly depends on your goal. A model can only show influences, which are considered by the modelling approach. It would be rather difficult to cover all influences.
      So, the question is, what should the be considered within the model? PD are highly dependent on many influences (structure of the asset, geometry of electrodes, insulation material, quality and age of the insulation, by products, defects, temperature, voltage level, rise time dU/dt of the test voltage, electrical field distribution, start electron) and much more. In theory models can be found for physical effects, but it takes a lot research to get a valid model. For this reason, it makes sense to define the terms and conditions for finding a model and to focus on a specific effect.
      We recommend discussing the goal and following up on research based on the definition of your thesis.
      We hope this answer could clear some things up already! If you want some more information please contact our technical support team: www.omicronenergy.com/en/support/technical-support/
      or use the following link to see all the training classes currently scheduled: www.omicronenergy.com/en/training/courses/f1/language:English/f3/application:Partial%20Discharge+Analysis+on+Power+Transformers/
      Best regards,
      Your OMICRON team

    • @himariarosa
      @himariarosa 4 роки тому +1

      @@omicronenergy thank you sir/ma'am.. the transformer model that possible we can use is the Distribution transformer three phase .. We are conducting more datas regarding this topic.. thank you for your response

    • @mohamedayoub6064
      @mohamedayoub6064 3 роки тому

      @@himariarosa hi mary
      my research topic is about this too
      can i know where can i read about the results of your lab team?

  • @asishthanapati7614
    @asishthanapati7614 3 роки тому

    Good sir

  • @gaspermilonge5121
    @gaspermilonge5121 2 роки тому

    Wow...