Fast4Ward® hull for Liza Unity FPSO moves into dry-dock

Поділитися
Вставка
  • Опубліковано 8 вер 2024
  • Watch the video of SBM Offshore’s first Fast4Ward® hull for the Liza Unity FPSO project when it moved into the Keppel FELS dry-dock. During this phase, the mooring structures are integrated and the first topsides modules are lifted onto the vessel.

КОМЕНТАРІ • 2