US Gypsum Narrow Gauge Operations 8/29/2022

Поділитися
Вставка
  • Опубліковано 24 сер 2024
  • USG operations from Plaster City, California to the Gypsum mine. I drove by around lunchtime and saw a crew arrive to work (1:00 pm start?). I then followed the empty train all the way to the mine via the dirt road parallel to the rail. Very sandy. 4X4 needed. I wasn't sure how long the load would take so I skipped following the loaded train back.
    As fate would have it, several weeks from this encounter, heavy rains would damage one of the rail bridges.

КОМЕНТАРІ • 2

  • @RandomRailfan828
    @RandomRailfan828 Рік тому +1

    Great shots there man!

  • @drg473
    @drg473 Рік тому +1

    Very nice vedio, do you know about how fast you had to go to match speed with the train